My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
relatively minor delay by using the number one lane. All freeway to <br />freeway connections to and from the study area are relatively free <br />flowing with the following exceptions: <br />I. The southbound Rte 57 to southbound I-5 connector during <br />both peak periods <br />2. The eastbound Rte 22 to northbound Rte 55 during the PM <br />peak period. <br />Peak period congestion on the southbound 1-5 creates a backup <br />of traffic on southbound Rte 57 and eastbound Rte 22 Freeways. Once a <br />motorist reaches the eastbound Rte 22 connector (from either southbound <br />Rte 57 or I-5) then free flow conditions are encountered through the <br />study area. Other than the existing congestion on the southbound 1-5, <br />nearly free flow freeway conditions are (or could be available) to/from <br />the study area. To take advantage of this situation, access to the <br />study area must be via Rte 22 rather than I-5. <br />Ramps <br />Several ramps serve the study area, but two in particular, are <br />considered important. These are the two Main Street interchanges with <br />I-5 and Rte 22. Neither of these interchanges is a conventional design <br />nor is either particularly well suited to accommodate the high volume of <br />traffic expected from new commercial development in the Main Street <br />Area. The 1-5/Main Street Interchange has one off -ramp directing <br />traffic onto a residential street with a stop sign at the end of the <br />ramp. The on -ramp directs on -ramp traffic through a circuitous "maze" <br />of tight turns through a residential neighborhood. A third ramp directs <br />Main Street traffic off to Broadway instead of Main Street and the Rte <br />22/Main Street Interchange is situated such that it does not serve Main <br />Street directly. It directs freeway traffic on or off to two side <br />streets -La Veta and Town and Country Road. in addition, the Main <br />Street/Rte 22 Interchange has no bridge over the freeway to connect the <br />on and off ramps. <br />75D27 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.