My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d <br />f This analysis should not be used to reach conclusions <br />regarding design details since, as was cautioned, the conditions <br />5 <br />simulated do not necessarily represent realistic ones. Rather, the <br />arterial level capacity analysis and the highway trip assignments <br />indicate the redistribution of travel patterns that will occur and form <br />the basis for identification of appropriate mitigation measures. <br />�j <br />Fashion Square Trip Assignment Without New Freeway Ramps <br />A qualitative "what if' type of analysis was conducted <br />regarding the effect of a failure to implement all or part of the <br />— <br />proposed new freeway ramp additions in the vicinity of Fashion Square. <br />The effect of the redistribution of freeway oriented traffic shown in <br />Figure 27. It should be noted that his assignment is for freeway trips <br />only (69.6 percent of total trips) and intended to depict only the <br />y, <br />changes to travel patterns resulting if none of the new ramps are <br />constructed. <br />The two new freeway ramps to be located on the west side of <br />Fashion Square are the most important ones in terms of diverting traffic <br />away from Main Street. If these two ramps are not constructed, then an <br />additional 2,674 vehicles in the peak period (935 vehicles in the peak <br />hour) will be superimposed on the arterial streets surrounding Fashion <br />Square. With the new ramps, this same traffic would not impact any <br />� <br />arterial streets. Failure to provide these two ramps will have a <br />significant detrimental impact on both Main Street and La Veta Avenue. <br />All of this traffic will involve left turn maneuvers from arterial <br />streets further magnifying the impact. Likewise, concentration of all <br />this new freeway traffic at the existing on/off ramp location will <br />overload those facilities. <br />Aside from the two new freeway ramps which directly serve <br />Fashion Square, significant impacts will result from failure to provide <br />several other new ramp installations or modifications. Failure to <br />75D-A6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.