Laserfiche WebLink
E <br />5.13.2 Electricity <br />5.13.2.1 Environmental Setting <br />Southern California Edison currently provides electricity to <br />the project site. This site is served by four 12 kV circuits served <br />from four adjacent substations. Three of the circuits enter the site <br />from overhead facilities and a fourth circuit enters the site as an <br />underground facility. Edison maintains an extensive underground system <br />within the northerly portion (Fashion Square Shopping Center) of the <br />project site.* <br />5.13.2.2 Impacts <br />Project Impacts <br />a <br />The existing uses on the project site consume approximately <br />2,397,948 Kwh per month of electricity.** As indicated in Table 44, the <br />proposed project would consume approximately 13,054,240 Kwh of <br />electricity per month. The removal of Mainstreet Center and the <br />construction of the proposed project would result in a net increase in <br />electrical consumption of approximately 10,656,292 Kwh per month. The <br />proposed project would be served by existing facilities located in the <br />area and the electric loads of the project are within parameters of <br />projected load growth which Edison is planning to meet in this area <br />(refer to Appendix IV).*** <br />f( <br />it <br />. meth, Southern California Edison Company. <br />** Based on 3.5 Kwh a month per square foot. <br />*** B. K. Smith, Southern California Edison Company. <br />75D-322 <br />