My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY K <br />G.I. k rn Biq kl•u <br />VICE MAYOR <br />R. W. E uxembourKef <br />COUNCR MEMBFR <br />klhn Aucua <br />Damd F. Cdsel <br />I.OKden Markel <br />PaluVa A. Ms'CmY,.m <br />AI(md C. Sprralo <br />May 4, 1981 <br />(D <br />CITY OF SANTA ANA <br />2110W (AN I I K N ALA • Ill 1. (A IX PRIM <br />SAN TA ANA, CAI B ORNU 92702 <br />CITY MANACIR <br />A I. Wilson <br />CITY ATTORNEY <br />Edward 1_ Cooper <br />CI FRK Of THE COUNCII <br />Ianicc-C Guy <br />RECEIVED <br />MAY 08 1981 <br />CNYIRuNMZNtAL <br />Doris Starnes snnls:u,v. <br />Environmental Studies Department <br />Ultrasystems, Inc. <br />P.O. Box 19605 <br />Irvine, CA 92715 <br />SUBJECT: ENVIRONMENTAL IMPACT REPORT FOR THE PROPOSED FASHION SQUARE <br />REDEVELOPMENT PROJECT <br />Dear Ms. Starnes: <br />The data you requested in your letter of April 24, 1981 is as follows: <br />Water <br />Fashion Square is served by a 12" main along the south boundary of Fashion <br />Square and a 12" water main in the frontage road next to the Santa Ana Freeway; <br />an 8" water main along the south property line of Metcalf Plaza serves the <br />shopping center south of Fashion Square. <br />Fashion Square has a private fire line extending around the exterior of the <br />structures that is served from a 10" fire line connected to the 12" water <br />main south of it. The private line is a combination of 8" and 6" with <br />20D,000 gallon underground reservoir and auxiliary pumps to provide additional <br />protection. <br />The stores are served domestic water through a privately owned water line <br />connected to the 12" water main at the south property line. The pipeline is <br />6" to the underground reservoir feedline then is 4" along the westerly and <br />northerly periphery of the buildings. <br />The project can be served by the existing water mains, although it may re- <br />quire some reinforcement. A 16" water main exists in Main Street at Memory <br />Lane. The City proposes to extend the 16" water main westerly to eventually <br />connect to the 16" water main in the frontage road on the northeast side of <br />the Santa Ana Freeway. The 16" water main will extend from Memory Lane to <br />Metcalf Plaza. <br />The impact of the project will depend upon the increased water demand over <br />the present demand. When the Howard Crooke Reservoir and Pumping Station <br />was built in Santiago Day Camp about 1/2 mile east of Fashion Square the <br />pressure and water capacity was increased at Fashion Square. Alternatives <br />75D-374 <br />
The URL can be used to link to this page
Your browser does not support the video tag.