My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following arterials surround and provide access to/from MainPlace Mall: <br />Main Street: This six -lane roadway provides direct access to/from the site at the signalized <br />intersections of Main Street and Town & Country, and Main Street at MainPlace Access Drive. In <br />the vicinity of MainPlace Mall, Main Street has three lanes in each direction with turning lanes at <br />intersections and a median. <br />Memory Lane: Extending east of Main Street, south of MainPlace Mall, Memory Lane is <br />a six -lane arterial. It intersects Lawson Way, providing access to SR-22. Memory Lane is <br />anticipated to provide primary access, along with Main Street, to the planned Main Street Concourse <br />mixed -use development. <br />MainPlace Drive: MainPlace Drive is a four -lane loop road surrounding the mall. It <br />intersects Main Street at the signalized intersections at Memory Lane and at Town & Country. <br />MainPlace Drive carries predominantly mall -oriented traffic, and as such, carries low levels of traffic <br />compared to its potential capacity. <br />Town & County Road: This four -lane roadway extends east of Main Street at the north end <br />of the project site. Town & Country Road has an interchange with eastbound Route 22 at a four-way <br />stop controlled intersection. <br />Existing Intersection Analyses <br />The following intersections were analyzed as part of the original traffic study for the Fashion <br />Square EIR: <br />Main Street at: <br />Chapman Avenue <br />Almond Avenue <br />Culver/Stewart <br />La Veta Avenue <br />Town & Country Road <br />Edgewood Road <br />Santa Clara Avenue <br />Buffalo Avenue <br />1 ith Street at: <br />Spurgeon Street <br />Penn Way <br />Valencia Avenue <br />Santiago Avenue <br />Lincoln Avenue <br />Addendum FIR -for Alain Place Santa Ana (EW.033) April4,1996 <br />Page 7 W Project No. 96-066 <br />75D-397 <br />
The URL can be used to link to this page
Your browser does not support the video tag.