My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ Improvements along La Veta Avenue, including the intersection of Main Street at La <br />Veta Avenue and La Veta Avenue at Pepper Street. <br />These improvements in combination with the mitigation measures originally identified for <br />the Fashion Square EIR, which have already been implemented, will provide adequate roadway <br />capacity to accommodate estimated traffic to be generated by the proposed expansion. <br />The proposed expansion modifications are not estimated to result in any additional significant <br />impacts compared to those identified in the Traffic Study for Fashion Square EIR. The measures <br />identified to mitigate the anticipated impacts of the Fashion Square Commercial Center served to <br />mitigate a much larger project than the proposed expansion and that which exists as MainPlace. The <br />measures are more than adequate to mitigate the estimated impacts of the proposed MainPlace <br />expansion. <br />Noise <br />Environmental Setting <br />As discussed in the Fashion Square EIR, vehicle traffic is the primary source of noise in the <br />project area. Major roadways previously described in that EIR continue to be the primary sources <br />of traffic noise in the area. The extension of Broadway Street over the Santa Ana freeway which <br />provides an additional link for traffic between the project site and the west side of the Santa Alfa <br />freeway has been completed. A noise barrier along the west side of Broadway Street between the <br />freeway and Santa Clara Avenue has been completed. <br />The Fashion Square EIR reports the results of sound level measurements that were taken in <br />the residential area which is located near Memory Lane (formerly Owens Drive) and Main Street. <br />Measurements were taken during the peak afternoon traffic period at the three locations depicted in <br />Figure 28 of the Fashion Square EIR. 12-minute average sound levels were 64 dBA, 57 dBA, and <br />52 dBA respectively at Positions 1, 2, and 3. Sound levels reported in the Fashion Square EIR have <br />likely increased in the time since those measurements were taken. Noise from traffic is proportional <br />to the volume of traffic. A rule of thumb is that a doubling of the traffic volume is needed to increase <br />traffic noise by 3 dB, and a tripling of traffic volume would be needed for a 5 dB increase in noise, <br />generally considered to be the threshold of a distinctly perceptible increase in noise. <br />Since the time the Fashion Square EIR was prepared, the amount of retail space at the center <br />has increased from approximately 522,000 square feet to 1,100,000 square feet or a factor of about <br />2:1. This corresponds to about a 3 dB increase in traffic noise for the immediate area and access to <br />MainPlace parking. Accordingly, existing peak period sound levels are estimated to be 67 dBA, 60 <br />dBA, and 55 dBA respectively at the three positions where measurements were previously taken. <br />A 3 dB increase in traffic noise implies that the contours depicted in Figure 28 in the EIR would <br />expand to a distance of about 1.5 times the distances to the associated roadways shown in Figure 28. <br />Addendum E1Rfor Matn Place/Santa Ana (F.R96-033) M Project <br />1996 <br />Page 16 ect No. 96-066 <br />75D-407 <br />
The URL can be used to link to this page
Your browser does not support the video tag.