Laserfiche WebLink
RESOLUTION 2019-XXX <br />3,92% <br />PROPOSED <br />REVENUE <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FY 18-19 <br />FEES <br />FY 19-20 <br />FEES <br />SECTION IX <br />PLANNING& BUILDING AGENCY <br />51602 <br />FEE <br />1) <br />SCHEDULE <br />For each plumbing fixture ortrap or set of fixtures <br />on one trap (including water, drainage piping, and <br />backflow protection therefore) <br />Each <br />11.43 <br />11.88 <br />51602 <br />2) <br />For each dental unit <br />Each <br />22.92 <br />23.82 <br />51602 <br />3) <br />Medical gas piping system per 100' <br />Per 100' <br />22.92 <br />23.82 <br />51602 <br />4) <br />For each building sewer <br />(a) Each additional connection <br />(b) Each additional 10O feet or fraction thereof <br />(c) Sewer/alteration/repair <br />Each <br />Each <br />Each <br />Each <br />33.76 <br />11.43 <br />11.43 <br />22.92 <br />35.08 <br />11.88 <br />11.88 <br />23.82 <br />51602 <br />5) <br />For each private sewage disposal system <br />Each <br />70.10 <br />72.85 <br />51602 <br />6) <br />For each cesspool (where permitted) <br />Each <br />33.76 <br />35.08 <br />51602 <br />7) <br />For each sewer cap <br />Each <br />96.78 <br />100.57 <br />51602 <br />8) <br />For each fixture cap <br />Each <br />6.12 <br />6.36 <br />51602 <br />9) <br />For each new gas piping system (includes one to <br />four outlets) <br />Each <br />22.92 <br />23.82 <br />51602 <br />10) <br />For each gas outlet of five or more <br />Each <br />3.63 <br />3.77 <br />51602 <br />11) <br />For the repair/replacement of a gas piping system <br />(Includes one to four outlets) <br />Each <br />22.92 <br />23.82 <br />51602 <br />12) <br />For the alteration/additlon to an existing gas system <br />(includes one to four outlets) <br />Each <br />33.76 <br />35.08 <br />51602 <br />13) <br />For each residential water heater and/or vent <br />Each <br />11.43 <br />11.88 <br />51602 <br />14) <br />For each commercial boller or water heater <br />Each <br />58.32 <br />60.61 <br />51602 <br />15) <br />For installation, alteration, or repair of water <br />piping, each 100' <br />Each <br />22.92 <br />23.82 <br />51602 <br />16) <br />Rain water piping (burled), each 100' <br />Each <br />14.77 <br />15.35 <br />51602 <br />17) <br />Rainwatersystems - per drain (inside building) <br />Each <br />22.92 <br />23.82 <br />51602 <br />18) <br />Roof drain system, per drain <br />Each <br />22.92 <br />23.82 <br />51602 <br />19) <br />Deck drains, per drain <br />Each <br />8.05 <br />8.37 <br />60 <br />75A-2-70 <br />