Laserfiche WebLink
RESOLUTION 2019-XXX <br />3.92% <br />PROPOSED <br />REVENUE <br />FY 18-19 <br />FY 19-20 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT <br />FEES <br />FEES <br />SECTION IX <br />PLANNING& BUILDING AGENCY <br />SOLAR ENERGY CODE <br />51611 <br />Any person desiring a permit required by the Solar Energy Each Permit <br />46.27 <br />48.08 <br />Code shall, at the time of filing, pay an application, fee of <br />$46.27. There Is no minimum fee for the Issuance of a <br />permit for single family residences and duplexes. The <br />minimum total fee for Issuance of a permit for all other uses <br />shall be $75,61. <br />75.61 <br />78.57 <br />FEE SCHEDULE <br />51611 <br />1) For collectors (including related piping and <br />regulating devices): <br />Up to 1,000 sq. ft. (93m') <br />11.43 <br />11.88 <br />Between 1,001(93.1m') and 2,000 sq. ft, (186m') <br />19.37 <br />20.13 <br />More than 2,000 sq. ft. (18m) <br />19.37 <br />20.13 <br />plus per 1,000 sq. ft. (93m') or fraction <br />2.03 <br />2.11 <br />thereof over 2,000 sq. ft. (186m) <br />51611 <br />2) For storage tanks (including related piping and <br />regulating devices): <br />Up to 750 gallons (3m) <br />9.90 <br />10.18 <br />Between 751 (3m) and 2,000 gallons <br />17.60 <br />18.29 <br />More than 2,000 (8m') gallons <br />17.60 <br />18.29 <br />plus per 1,000 (4m') or fraction thereof <br />2.03 <br />2.11 <br />over 2,000 gallons (8m') <br />51611 <br />3) For rock storage: <br />Up to 1,500 cu. ft. (42m) <br />11.43 <br />11.88 <br />Between 1,501 (42.1m) and 3,000 cu. ft. (84m) <br />19.37 <br />20.13 <br />More than 3,000 cu. ft. (84m') <br />19.37 <br />20.13 <br />plus per 1,000 cu. ft. (28m3) or fraction <br />2.02 <br />2.10 <br />thereof over 3,000 cu. ft. (84m') <br />75A32-73 <br />