Laserfiche WebLink
Local Guidelines for Implementing the <br />California Envimmnental Oual'ty Act (2019) ENVIRONMENTAL IMPACT REPORT <br />Absent these two circumstances, future expansion of a project need not be discussed. <br />CEQA does not require speculative discussion of future development that is unspecific or <br />uncertain. However, if future action is not considered now, it must be considered and <br />environmentally evaluated before it is actually implemented. <br />7.25 NOTICE OF COMPLETION OF DRAFT EIR; NOTICE OF AVAILABILITY OF DRAFT EIR. <br />Notice of Completion. When the Draft EIR is completed, a Notice of Completion (Form <br />"H") must be filed with OPR in a printed hard copy or in electronic form on a diskette or by <br />electronic mail transmission. The Notice shall contain: <br />(a) A brief description of the proposed project; <br />(b) The location of the proposed project including the proposed project's latitude and <br />longitude; <br />(c) An address where copies of the Draft EIR are available and a description of how the <br />Draft EIR can be provided in an electronic format; and <br />(d) The review period during which comments will be received on the Draft EIR. <br />OPR has developed a model form Notice of Completion. Form H follows OPR's model. <br />To ensure that the documents are accepted by OPR staff, this form should be used when <br />documents are transmitted to OPR. <br />Notice of Availability. At the same time it sends a Notice of Completion to OPR, the <br />City shall provide public notice of the availability of the Draft EIR by distributing a Notice of <br />Availability of Draft EIR (Form "K"). The Notice of Availability shall include at least the <br />following information: <br />(a) A brief description of the proposed project and its location; <br />(b) The starting and ending dates for the review period during which the City will receive <br />comments, the manner in which the City will receive those comments, and whether the <br />review period has been shortened; <br />(c) The date, time, and place of any scheduled public meetings or hearings to be held by the <br />City on the proposed project, if the City knows this information when it prepares the <br />Notice; <br />(d) A list of the significant environmental effects anticipated as a result of the project; <br />(e) The address where copies of the EIR and all documents incorporated by reference in the <br />EIR will be available for public review, and a description of how the Draft EIR can be <br />obtained in electronic format. This location shall be readily accessible to the public <br />during the City's normal working hours ; and <br />(f) A statement indicating whether the project site is included on any list of hazardous waste <br />facilities, land designated as hazardous waste property, or hazardous waste disposal site, <br />and, if so, the information required in the Hazardous Waste and Substances Statement <br />pursuant to Government Code Section 65962.5. <br />The Notice of Availability shall be provided to: <br />(a) Each Responsible and Trustee Agency; <br />2019 City of Santa Ana Local Guidelines <br />OBest Best & Krieger LLP <br />75D-123 <br />