My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH - VMT AND CEQA GUIDELINES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/18/2019
>
75D - PH - VMT AND CEQA GUIDELINES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 5:36:02 PM
Creation date
6/13/2019 5:31:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/18/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Guidelines for hnplementing the <br />California Environmental Quality Act (2019) TYPES OF EIRS <br />Supplemental EIR need contain only the information necessary to make the previous EIR <br />adequate for the project as revised. <br />A Supplemental EIR shall be given the same kind of notice and public review as is given <br />to a Draft EIR but may be circulated by itself without recirculating the previous EIR. <br />When the decision -making body decides whether to approve the project, it shall consider <br />the previous EIR as revised by the Supplemental EIR. Findings shall be made for each <br />significant effect identified in the Supplemental EIR. <br />8.06 ADDENDUM TO AN EIR. <br />The City shall prepare an Addendum to a previously certified EIR, rather than a <br />Subsequent or Supplemental EIR, only if changes or additions to the EIR are necessary, but none <br />of the conditions described in Local Guidelines Section 8.04 or 8.05 calling for preparation of a <br />Subsequent or Supplemental EIR have occurred. Since significant effects on the environment <br />were addressed by findings in the original EIR, no new findings are required in the Addendum. <br />An Addendum to an EIR need not be circulated for public review but should be included <br />in or attached to the Final EIR. The decision -making body shall consider the Addendum with <br />the Final EIR prior to making a decision on a project. A brief explanation of the decision not to <br />prepare a Subsequent EIR or a Supplemental EIR should be included in the Addendum, the Lead <br />Agency's findings on the project, or elsewhere in the record. This explanation must be <br />supported by substantial evidence. <br />8.07 STAGED EIR. <br />When a large capital project will require a number of discretionary approvals from <br />governmental agencies and one of the approvals will occur more than two years before <br />construction will begin, a Staged EIR may be prepared. The Staged EIR covers the entire project <br />in a general form or manner. A Staged EIR should evaluate a proposal in light of current and <br />contemplated plans and produce an informed estimate of the environmental consequences of an <br />entire project. The particular aspect of the project before the City for approval shall be discussed <br />with a greater degree of specificity. <br />When a Staged EIR has been prepared, a Supplemental EIR shall be prepared when a <br />later approval is required for the project and the information available at the time of the later <br />approval would permit consideration of additional environmental impacts, mitigation measures, <br />or reasonable alternatives to the project. <br />8.08 PROGRAM EIR. <br />A Program EIR is an EIR that may be prepared on an integrated series of actions that are <br />related either: <br />(a) Geographically; <br />(b) As logical parts in a chain of contemplated actions; <br />2019 City of Smta Ana Local Guidelines <br />CBest Best & Krieger LLP <br />75D-141 <br />
The URL can be used to link to this page
Your browser does not support the video tag.