My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-047 - Adopting Mitigated Negative Declaration Environmental Review No. 2018-75
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-047 - Adopting Mitigated Negative Declaration Environmental Review No. 2018-75
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 12:18:40 PM
Creation date
6/20/2019 8:32:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-047
Date
6/4/2019
Destruction Year
P
Document Relationships
NS-2968 - Approving Amendment Application No. 2019-01 Rezoning the Property Located at 651 West Sunflower Avenue from Single-Family Residential (R-1) to Specific Development No. 94 (SD-94)...
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Costa Mesa Development <br />7. <br />Avenue of the Arts Hotel <br />3350 Avenue of the Arts <br />150 Room Hotel" <br />8. <br />580 Anton Boulevard <br />580 Anton Boulevard <br />250 DU Apartment <br />9. <br />Symphony Apartments <br />585-595 Anton Boulevard <br />393 DU Apartment, 4,104 SF <br />retail <br />10. <br />Lucene <br />929 Baker Street <br />56 DU Single Family Detached <br />11. <br />The Edge <br />789 & 795 Paularino Avenue <br />19 DU Single Family Detached <br />62 DU Apartment <br />5.230 TSF Retail <br />12. <br />The Plan[ <br />2972 Century Place <br />5.315 TSF Restaurant/Food <br />stalls <br />8.934 TSF Office/Live-work <br />office <br />13. <br />1957 Newport Blvd <br />1957 Newport Boulevard <br />38 DU Condominiums <br />Condominiums <br />14. <br />2277 Harbor Blvd Apartments <br />2277 Harbor Boulevard <br />224 DU Apartment <br />Phase 1: <br />344,661 SF Office <br />5,207 SF Shopping Center <br />15. <br />The Press <br />1375 Sunflower Avenue <br />9,901 SF Drinking Place <br />31,168 SF High -turnover <br />restaurant <br />5,808 SF Fast-food restaurant <br />without drive-thru <br />16. <br />Industrial Building <br />1585 MacArthur Boulevard <br />98.807 TSF Industrial <br />Cumulative projects include local development as well as general growth within the project area. <br />However, as with most development, the greatest source of air emissions is from mobile sources, which <br />travel well out of the local area. Therefore, from an air quality standpoint, the cumulative analysis would <br />extend beyond any local projects and when wind patterns are taken into account, air emissions would <br />cover an even larger area. Therefore, the analysis for the project's cumulative air quality impacts must <br />be generic by nature. <br />The project area is out of attainment for ozone and suspended particulates (PM10 and PM2.5). <br />Construction and operation of cumulative projects would further degrade the local air quality, as well as <br />the air quality of the South Coast Air Basin. The greatest cumulative impact on the quality of the air in <br />the region would be the incremental addition of pollutants mainly from increased traffic volumes from <br />cumulative development, including residential, commercial, and industrial, and the operation of heavy <br />equipment and trucks associated with the construction of these projects. Air quality would be <br />temporarily degraded during construction activities of the cumulative projects that occur separately or <br />simultaneously. However, in accordance with the SCAQMD methodology, projects that do not exceed <br />the SCAQMD criteria or can be mitigated to less than criteria levels are not significant and do not <br />contribute to the overall cumulative air quality impact. With respect to long-term emissions, this project <br />would create a less than significant cumulative impact. <br />12 According to the Addendum to the Wyndham Boutique Hotel/High-Rise Residential Project Final Environmental Impact Report No. <br />1054 (SCH No. 2007011125), the previously approved project included the construction of a 238-room hotel, and the proposed <br />project includes the expansion of the hotel to include an additional 150-rooms. Therefore, the net additional 150-room hotel was <br />analvzed under the cumulative backaround traffic settina in this report. <br />Legacy Sunflower Apartments Page 107 <br />Mitigated Negative Declaration — March 14, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.