Laserfiche WebLink
City of Santa Ana Addendum to the <br />MainPlace Mall Transformation Proiect Fashion Square Commercial Center Final EIR <br />buildings and impacts related to the need for communication systems would be less <br />than significant. No new impact would occur. <br />Water <br />The proposed Project would redevelop the Project site, which is currently served by the <br />City's water infrastructure. The existing water infrastructure that serves the Project area: <br />• A 16-inch water line in Main Street, terminating at the north leg of Main Place <br />Drive <br />• A 16-inch water line in the south leg of Main Place Drive from Main Street to the <br />southwest mall entry drive <br />• A 12-inch water line in the north leg of Main Place Drive from Main Street to the <br />north leg of the on -site private ring road. <br />• A 16-inch water line under 1-5, connecting to the Main Place Drive main at the <br />southwest corner of the Project site <br />A 16-inch water line in southwest private drive entry from Main Place Drive to the <br />on -site private ring road. <br />A 16-inch water line in south private drive entry (the Broadway extension) from <br />Main Place Drive to the on -site private ring road. <br />A 12-inch water line in the on -site ring road, looping around the Project site. <br />In addition, the City also has approximately 15 fire hydrants near the Project site and <br />approximately 24 water meters serving the site. <br />The proposed Project would install new water infrastructure on the Project site that <br />would connect to the existing offsite water lines. The new onsite water system would <br />convey water supplies to the proposed buildings and landscaping through <br />plumbing/landscaping fixtures that are compliant with the CalGreen Plumbing Code for <br />efficient use of water. The existing offsite infrastructure has the capacity to provide the <br />increased water supplies needed to serve the proposed Project, and no extensions or <br />expansions to the water pipelines that convey water to the site would be required. The <br />construction activities related to the onsite water infrastructure is similar to that which <br />was evaluated in the 1983 EIR, and similarly, impacts related to water infrastructure <br />would be less than significant. No new impact would occur. <br />A Water Supply Assessment (WSA) was prepared for the Specific Plan, included as <br />Appendix H, which summarized the anticipated water demands and identified supplies <br />set forth in the City's 2015 Urban Water Management Plan (UWMP). As shown in Table <br />PSU-1, the WSA identifies that buildout of the proposed Project would result in a water <br />demand of 552,000 gallons per day. <br />EEO <br />