Laserfiche WebLink
Mitigation Program for the <br />City of Santa Ana MainPlace Mall Transformation Project <br />Final EIR Mitigation Measures (MMs) <br />Applicable? <br />Explanation <br />Final EIR Section 5.1: Land Use <br />MM 5.1-1(a): The Project should be landscaped similar to or more <br />Applicable <br />extensive than the existing landscaping in order to buffer the <br />and ongoing. <br />_ <br />development from surrounding residential areas as much as possible. <br />MM 5.1-1(b): All tenants displaced by the Project will be provided <br />Not <br />Subsection (b) is no longer applicable because it addressed the <br />assistance in accordance with State law and Santa Ana Redevelopment <br />applicable. <br />displacement of tenants associated with demolition of the open-air <br />Agency policies. <br />Fashion Square Shopping Center to construct the enclosed shopping <br />center. Additionally, policies of the prior Santa Ana Redevelopment <br />Agency are not applicable. Existing tenants of MainPlace Mall occupy <br />space under lease agreements. Further, no tenants will be displaced <br />by the MainPlace Project. <br />MM 5.1-1(c): The Agency and the Project Participants should offer KLST <br />Not <br />Subsection (c) is no longer applicable because the 2700 Main Street <br />land (including the Agency owned land to the south of the Fidelity <br />applicable. <br />office building has surface parking on the parcel. No additional parking <br />Savings Building and a portion of the Project site in the near vicinity at fair <br />is required to be provided for this off -site property. <br />market value (or fair rent, if a lease arrangement is preferred) in trade-off <br />against the acquisition of Sales Parcels 3 and 5. The land area so offered <br />should be sufficient to allow a total of at least 351 parking spaces serving <br />the Fidelity Savings building assuming a maximum permitted amount of <br />small car spaces, with the Agency and/or Project Participants bearing any <br />necessary design and installation costs. <br />MM 5.1-1(d): Ultimate development of the Project site should occur <br />through the specific plan process. The specific plan should provide <br />Applicable <br />information on how the Project would incorporate pedestrian walkways, <br />and ongoing. <br />building configurations, and open space with key transit routes. <br />Final EIR Section 5.4: Biota <br />MM 5.4-1: The Participation Agreement requires the Project Participant to <br />Applicable <br />The wording has been updated to be consistent with Section 5, <br />provide adequate landscaping on the site and provide for the <br />and ongoing, <br />Administration and Implementation, of the MainPlace Specific Plan. <br />Redevelopment Agency to approve all preliminary and final landscaping <br />as modified. <br />The revision does not change the intent of the measure. <br />plans submitted by the Participant. <br />MM 5.4-1: The Applicant shall provide adequate landscaping on <br />