My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-040 - Mainplace Mall Transformation
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-040 - Mainplace Mall Transformation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 10:01:52 AM
Creation date
6/20/2019 8:39:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-040
Date
6/4/2019
Destruction Year
P
Document Relationships
2019-041 - Approving Tentative Parcel Map No. 2018-01
(Amended By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2019
NS-2967 - Approving Development Agreement No. 2018-02 Between City of Santa Ana and Mainplace ShoppingTown, LLC for Mainplace Mall Transformation Project
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drainage System Maintenance SC-44 <br />Description <br />As a consequence of its function, the stormwater conveyance <br />system collects and transports urban runoff and stormwater that <br />may contain certain pollutants. The protocols in this fact sheet <br />are intended to reduce pollutants reaching receiving waters <br />through proper conveyance system operation and maintenance. <br />Approach <br />Pollution Preoention <br />Maintain catch basins, stormwater inlets, and other stormwater <br />conveyance structures on a regular basis to remove pollutants, <br />reduce high pollutant concentrations during the first flush of <br />storms, prevent clogging of the downstream conveyance system, <br />restore catch basins' sediment trapping capacity, and ensure the <br />system functions properly hydraulically to avoid flooding. <br />Suggested Protocols <br />Catch Basins/Inlet Structures <br />• Staff should regularly inspect facilities to ensure compliance <br />with the following: <br />Immediate repair of any deterioration threatening <br />structural integrity. <br />Cleaning before the sump is 40% full. Catch basins <br />should be cleaned as frequently as needed to meet this <br />standard. <br />Stenciling of catch basins and inlets (see SC34 Waste <br />Handling and Disposal). <br />Objectives <br />• Cover <br />• Contain <br />• Educate <br />• Reduce/Minimize <br />Targeted Constituents <br />Sediment <br />✓ <br />Nutrients <br />Trash <br />✓ <br />Metals <br />Bacteria <br />✓ <br />Oil and Grease <br />Organics <br />CASOA <br />MEEK- <br />Allsoclation <br />January 2003 California Stormwater BMP Handbook 1 of 6 <br />Industrial and Commercial <br />wwwcabmphandbooks com <br />
The URL can be used to link to this page
Your browser does not support the video tag.