Laserfiche WebLink
Generated with <br />Version 6.00-00 <br />Intersection Level Of Service Report <br />Intersection 2: Bedford Rd / La Veta Ave <br />Control Type: Signalized Delay (sec /veh): - <br />Analysis Method: ICU 1 Level Of Service: A <br />Analysis Period: 15 minutes Volume to Capacity (v/c): 0.579 <br />Intersection Setup <br />Name <br />Bedford Rd <br />Bedford Rd <br />La Veta Ave <br />La Veta Ave <br />Approach <br />Northbound <br />Southbound <br />Eastbound <br />Westbound <br />Lane Configuration <br />i r r <br />r <br />IF <br />A 1 F <br />Turning Movement <br />Left <br />Thru <br />Right <br />Left <br />Thru <br />Right <br />Left <br />Thru <br />Right <br />Left <br />Thru <br />Right <br />Lane Width [ft] <br />12.00 <br />i2.0, <br />12.00 <br />12.00 <br />12.00 <br />12.00 <br />12.00 <br />12.00 <br />12.00 <br />12.00 <br />12.00 <br />12.00 <br />No. of Lanes in Pocket <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Pocket Length [ft] <br />100.00 <br />100.00 <br />100.00 <br />100.00 <br />100.00 <br />100.00 <br />100.00 <br />100.00 <br />100.00 <br />100.00 <br />100.00 <br />100.( <br />Speed [mph] <br />30.00 <br />30.00 <br />30.00 <br />30.00 <br />Grade [%] <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Crosswalk <br />Yes <br />Yes <br />Yes <br />Yes <br />Volumes <br />Name <br />Bedford Rd <br />Bedford Rd <br />La Veta Ave <br />La Veta Ave <br />Base Volume Input [veh/h] <br />26 <br />0 <br />40 <br />0 <br />0 <br />11 <br />0 <br />1035 <br />301 <br />194 <br />322 <br />2 <br />Base Volume Adjustment Factor <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />Heavy Vehicles Percentage [%] <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />Growth Rate <br />1.00 <br />1.00 <br />1.00 <br />' ^^ <br />' ^^ <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />In -Process Volume [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Site -Generated Trips [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Diverted Trips [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Pass -by Trips [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Existing Site Adjustment Volume [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Other Volume [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Total Hourly Volume [veh/h] <br />26 <br />0 <br />40 <br />11 <br />0 <br />1035 <br />301 <br />194 <br />322 <br />2 <br />Peak Hour Factor <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />Other Adjustment Factor <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />Total 15-Minute Volume [veh/h] <br />7 <br />0 <br />10 <br />0 <br />0 <br />3 <br />0 <br />259 <br />75 <br />49 <br />81 <br />1 <br />Total Analysis Volume [veh/h] <br />26 <br />1 0 <br />1 40 <br />0 <br />11 <br />0 <br />1035 <br />301 <br />194 <br />322 <br />2 <br />Pedestrian Volume [ped/h] <br />0 <br />0 <br />0 <br />0 <br />Bicycle Volume [bicycles/h] <br />0 <br />0 <br />0 <br />0 <br />Scenario 1: 1 EXAM <br />Santa Ana Main Place <br />Kimley-Horn <br />12/6/2018 <br />