Laserfiche WebLink
ROJECT TITLE: <br />Euclid Street Rehabilitation: 1st to Hazard <br />ROJECT CATEGORY: <br />Street Improvements - <br />Arterial Street Rehabilitation <br />6 <br />E• <br />� <br />.M. <br />i <br />p <br />0 <br />} <br />CITY OF SANTA ANA FY 19/20 CI <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, <br />gutters, sidewalks, driveway approaches, and <br />wheelchair ramps within this segment of roadway. <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has <br />been developed to prioritize and recommend the most <br />cost-effective roadway repairs, and maximize the return <br />from available funding for street pavement. This <br />segment of Euclid Street pavement rehabilitation is <br />identified as a high priority in the PMP. <br />PROJECT COSTS Fy 19/20 FY 20/21 FY 21122 FY 22/23 FY 23/24 FY 24/25 FY 25126 <br />Construction $1,111,000 <br />Engineering $89,000 <br />TOTAL $1,200,000 <br />SOURCE OF FUNDS FY 19/20 FY 20121 FY 21122 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />RMRA SBI $1,200,000 <br />TOTAL $1,200,000 <br />AGENCY DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Sean Thomas, Senior Civil Engineer 24-May-2019 <br />0 <br />