Laserfiche WebLink
PROJECT TITLE: <br />Euclid Street Rehabilitation: McFadden to 1st <br />PROJECT CATEGORY: <br />Street Improvements - <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />k <br />CITY OF SANTA ANA FY 19/20 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacemenVinstallation of missing or damaged, curbs, <br />gutters, sidewalks, driveway approaches, and <br />wheelchair ramps within this segment of roadway. <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has <br />been developed to prioritize and recommend the most <br />cost-effective roadway repairs, and maximize the return <br />from available funding for street pavement. This <br />segment of Euclid Street pavement rehabilitation is <br />identified as a high priority in the PMP. <br />PROJECT COSTS FY 19/20 FY 20/21 FY 21 /22 FY 22123 FY 23/24 FY 24/25 FY 25/26 <br />Construction $1,019,000 <br />Engineering $81,000 <br />TOTAL $1,100,000 <br />SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22123 FY 23/24 FY 24/25 FY 25/26 <br />RMRA SB1 $1,100,000 <br />TOTAL $1,100,000 <br />AGENCY DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Sean Thomas, Senior Civil Engineer 24-May-2019 <br />-11- <br />+rr-- <br />