Laserfiche WebLink
(PROJECT TITLE: <br />Flower Street Sewer Main Improvements <br />30JECT CATEGORY: <br />Utility/Drainage/Lighting Improvements - <br />Sewer Improvements <br />LOCATION MAP <br />CITY OF SANTA ANA FY 19/20 CI <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Sewer capacity improvement include upsizing 1,554 <br />feet of 12 inch pipe to 15 inch pipe, upsizing 783 feet <br />of 10 inch pipe to 15 inch pipe, and upsizing 634 feet <br />of 8 inch pipe to 10 inch pipe. <br />PROJECT NEED: <br />This project is required to maintain effective operation <br />of the City's sanitary sewer system, eliminate sewer <br />capacity related issues, reduce sewer maintenance <br />requirements and prevent sewer spills. <br />PROJECT COSTS FY 19/20 FY 20121 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />Construction $1,950,000 <br />Engineering $150,000 <br />TOTAL 52,100,000 <br />SOURCE OF FUNDS FY 19120 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />SEWER $2,100,000 <br />CONNECTION <br />TOTAL 52,100,000 <br />AGENCY <br />DIVISION: <br />CONTACT: <br />DATE: <br />Public Works Agency <br />Water Resources <br />Armando Fernandez, Senior Civil Engineer <br />24-May-2019 <br />-34- <br />