My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-050 -Adopting Local CEQA Guidelines
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-050 -Adopting Local CEQA Guidelines
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2023 4:54:33 PM
Creation date
6/24/2019 8:39:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-050
Date
6/18/2019
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Guidelines for Implementing the <br />California Environmental Quality Act (2019) ENVIRONMENTAL IMPACT REPORT <br /> <br />Absent these two circumstances, future expansion of a project need not be discussed. <br />CEQA does not require speculative discussion of future development that is unspecific or <br />uncertain. However, if future action is not considered now, it must be considered and <br />environmentally evaluated before it is actually implemented. <br />7.25 N OTICE OF C OMPLETION OF D RAFT EIR; N OTICE OF A VAILABILITY OF D RAFT EIR. <br />Notice of Completion. When the Draft EIR is completed, a Notice of Completion (Form <br />electronic mail transmission. The Notice shall contain: <br />(a) A brief description of the proposed project; <br />(b) The lo <br />longitude; <br />(c) An address where copies of the Draft EIR are available and a description of how the <br />Draft EIR can be provided in an electronic format; and <br />(d) The review period during which comments will be received on the Draft EIR. <br />To ensure that the documents are accepted by OPR staff, this form should be used when <br />documents are transmitted to OPR. <br />Notice of Availability. At the same time it sends a Notice of Completion to OPR, the <br />City shall provide public notice of the availability of the Draft EIR by distributing a Notice of <br /> at least the <br />following information: <br />(a) A brief description of the proposed project and its location; <br />(b) The starting and ending dates for the review period during which the City will receive <br />comments, the manner in which the City will receive those comments, and whether the <br />review period has been shortened; <br />(c) The date, time, and place of any scheduled public meetings or hearings to be held by the <br />City on the proposed project, if the City knows this information when it prepares the <br />Notice; <br />(d) A list of the significant environmental effects anticipated as a result of the project; <br />(e) The address where copies of the EIR and all documents incorporated by reference in the <br />EIR will be available for public review, and a description of how the Draft EIR can be <br />obtained in electronic format. This location shall be readily accessible to the public <br />during the City <br />(f) A statement indicating whether the project site is included on any list of hazardous waste <br />facilities, land designated as hazardous waste property, or hazardous waste disposal site, <br />and, if so, the information required in the Hazardous Waste and Substances Statement <br />pursuant to Government Code Section 65962.5. <br />The Notice of Availability shall be provided to: <br />(a) Each Responsible and Trustee Agency; <br /> <br />2019 City of Santa Ana Local Guidelines 7-21 ©Best Best & Krieger LLP <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.