My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-050 -Adopting Local CEQA Guidelines
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-050 -Adopting Local CEQA Guidelines
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2023 4:54:33 PM
Creation date
6/24/2019 8:39:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-050
Date
6/18/2019
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Guidelines for Implementing the <br />California Environmental Quality Act (2019) ENVIRONMENTAL IMPACT REPORT <br /> <br />City <br />accepted. The level of detail contained in the response, however, may correspond to the level of <br />detail provided in the comment (i.e., responses to general comments may be general). A general <br />response may be appropriate when a comment does not contain or specifically refer to readily <br />available information, or does not explain the relevance of evidence submitted with the <br />comment. <br />Moreover, the City shall respond to any specific suggestions for project alternatives or <br />mitigation measures for significant impacts, unless such alternatives or mitigation measures are <br />facially infeasible. The response shall contain recommendations, when appropriate, to alter the <br />project as described in the Draft EIR as a result of an analysis of the comments received. <br />At least ten (10) days prior to certifying a Final EIR, the Lead Agency shall provide its <br />proposed written response, either in printed copy or in an electronic format, to any public agency <br />that has made comments on the Draft EIR during the public review period. The City, as Lead <br />Agency, is not required to respond to comments received after the public review period. <br />However, the City, as Lead Agency, should consider responding to all comments if it will not <br />delay action on the Final EIR, since any comment received before final action on the EIR can <br />form the basis of a legal challenge. A written response that addresses the comment or adequately <br />explains the City <br />challenge. <br />7.31 P REPARATION AND C ONTENTS OF F INAL EIR. <br />Following the receipt of any comments on the Draft EIR as required herein, such <br />comments shall be evaluated by Staff and a Final EIR shall be prepared. <br />The Final EIR shall meet all requirements of Local Guidelines Section 7.18 and shall <br />consist of the Draft EIR or a revision of the Draft, a section containing either verbatim or in <br />summary the comments and recommendations received through the review and consultation <br />process, a list of persons, organizations and public agencies commenting on the Draft, and a <br />section containing the responses of the City to the significant environmental points raised in the <br />review and consultation process. <br />7.32 R ECIRCULATION W HEN N EW I NFORMATION I S A DDED TO EIR. <br />When significant new information is added to the EIR after notice and consultation but <br />before certification, the Lead Agency must recirculate the Draft EIR for another public review <br />well as additional data or other information. <br />New information is significant only when the EIR is changed in a way that would deprive <br />the public of a meaningful opportunity to comment upon a substantial adverse environmental <br />effect of a project or a feasible way to mitigate or avoid such an effect, including a feasible <br />project alternative, that the project proponents decline to implement. Recirculation is required, <br />for example, when: <br />(1) New information added to an EIR discloses: <br /> <br />2019 City of Santa Ana Local Guidelines 7-27 ©Best Best & Krieger LLP <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.