My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO WATER SUPPLY ASSESSMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/02/2019
>
55A - RESO WATER SUPPLY ASSESSMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 5:19:54 PM
Creation date
6/27/2019 5:06:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
7/2/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELAN PROJECT <br />WATER SUPPLY ASSESSMENT NOVEMBER 2, 2017 <br />2.1.1 6ddii g Water Use <br />As mentioned, the existing land use of the Project is vacant at the northern portion of the Project <br />with an existing hotel and parking at the middle and southern portions. The Elks Lodge area in <br />the center of the site covers a footprint of approximately 86,000 sf. The Elks Lodge structures <br />cover approximately 50,000 SF and has approximately 20,000 SF of existing landscaping. See <br />Figure 2 for an aerial image of the existing land uses at the proposed Project site. <br />The water demand factors from the City of Santa Ana Design Guidelines for Water and Sewer <br />Facilities (March 2017)' were utilized to establish an estimate of existing water demands at the <br />Project site. A commercial water demand factor of 2,500 gallons per day (gpd) per acre was <br />employed to account for Elks Lodge at the existing Project site. In addition, a landscape water <br />demand factor of 3,000 gpd/acre was employed for the scattered landscaping at the Project <br />site. See Table 2 below for estimated existing water demands and the Project site. <br />Table 2 Existing Water Demands <br />bMng Land <br />Land Use <br />Land Use <br />Water Demand Factor <br />Eid Watx <br />0 We1erSquare <br />Use <br />Footage .:, <br />Aawp <br />{ Wacre) .. <br />. <br />Downd t" ' <br />Elks Lodge <br />50,000 <br />1.15 <br />2,500 <br />2,875 <br />3.22 <br />Landscaped <br />Area <br />20,000 <br />0.46 <br />3,000 <br />635 <br />0.71 <br />TOW <br />7OA00 <br />1.61 <br />-- <br />3,610 <br />3.93 <br />Nolen: <br />d gallons Per day AFY aoa-feet per year <br />As shown above, the estimated existing water use at the Project site is approximately 3,510 <br />gallons per day (gpd) or 3.9 acre-feet per year (AFY). An estimated annual difference between <br />existing water demands and proposed water demands resulting from the proposed Project are <br />calculated and shown in Section 2.1.2 below. <br />3 City of Santa Ana Design Guidelines for Water and Sewer Facilities (March 2017). Found here: <br />http://www.sonta-ano,org/pm/documents/DesignGuidelinw.pdf <br />FuscOE ENGINEERING, INC. <br />55A-113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.