My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T.E. ROBERTS INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
T.E. ROBERTS INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 10:17:50 AM
Creation date
7/10/2019 12:24:18 PM
Metadata
Fields
Template:
Contracts
Company Name
T.E. ROBERTS INC.
Contract #
P 11-6413
Agency
Public Works
Council Approval Date
4/2/2019
Notes
Project
Document Relationships
23A - PROJ - SA-5 VAULT MOD
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\04/02/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Number Project No. 11-6413 SA-5 Vault Modifications <br />To <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Change Order Number 2 <br />Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />1. Cost to Repair existing 6" Sewer Lateral that crossed Bristol Street and was damaged <br />during excavation for the 18" SA 5 pipeline relocation. (COR #7). <br />TOTAL AGREED PRICE =11 199.81 <br />1. Cost for additional work to remove previously installed 18" CMLCSP SA 5 pipeline relocation <br />and fabricate and install new 18" CMLCSP to go over the top of the repaired existing 6" Sewer <br />lateral. (COR #8) <br />TOTAL AGREED PRICE = 48,172.82 <br />TOTAL AGREED PRICE = 59,372.63 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.