Laserfiche WebLink
Project Number Project No. 11-6413 SA-5 Vault Modifications <br />To <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Change Order Number 2 <br />Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />1. Cost to Repair existing 6" Sewer Lateral that crossed Bristol Street and was damaged <br />during excavation for the 18" SA 5 pipeline relocation. (COR #7). <br />TOTAL AGREED PRICE =11 199.81 <br />1. Cost for additional work to remove previously installed 18" CMLCSP SA 5 pipeline relocation <br />and fabricate and install new 18" CMLCSP to go over the top of the repaired existing 6" Sewer <br />lateral. (COR #8) <br />TOTAL AGREED PRICE = 48,172.82 <br />TOTAL AGREED PRICE = 59,372.63 <br />Page 1 of 2 <br />