Laserfiche WebLink
CITY OF SANTA ANA <br /> • PUBLIC WORKS AGENCY <br /> CONTRACT CHANGE ORDER <br /> • <br /> Project Number Project No. 11-6413 SA-5 Vault Modifications Change Order Number 3 <br /> To T.E. Roberts Inc. Contractor <br /> You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> EXTRA WORK AT AGREED PRICE <br /> DESCRIPTION Unit qty Total <br /> (Estimate) <br /> Engineered Shoring Plans for Options 1 LS $7,290.00 <br /> Submission&Additional MWD requests & Shoring <br /> 1 LS $6,500,00 <br /> Requirements <br /> Additional 45 Degree Bends A&B 1 LS $8,174.60 <br /> Additional Fabrication Per MWD Change 1 LS $9,320.00 <br /> Abandon Previously Installed Pipeline 1 LS $5,500.00 <br /> Remove & Dispose of Conflicting Concrete 1 LS $31,239.00 <br /> Remove&Dispose of Conflict Vault 1 LS $12,500.00 <br /> Line-Item Adjustments to accommodate balance of <br /> work <br /> BI=1 Mobilization 1 LS $15,000.00 <br /> BP-21 Traffic Control 1 LS $3,600.00 <br /> BIc27 Dewatenng 1 LS $4,000,00 <br /> Credit for BI4 Construct 4" Bottom Drain Blow-off Assembly 1 LS ($22,300.00) <br /> TOTAL $80,823.60 <br /> This is the final cost and full compensation including all labor and materials to complete the <br /> modifications for the SA 5 Vault and Pipeline project. No further compensation will be considered <br /> after this final Change Order. <br /> Page 1 of 2 <br />