My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T.E. ROBERTS INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
T.E. ROBERTS INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 10:17:50 AM
Creation date
7/10/2019 12:24:18 PM
Metadata
Fields
Template:
Contracts
Company Name
T.E. ROBERTS INC.
Contract #
P 11-6413
Agency
Public Works
Council Approval Date
4/2/2019
Notes
Project
Document Relationships
23A - PROJ - SA-5 VAULT MOD
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\04/02/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> PUBLIC WORKS AGENCY <br /> CONTRACT CHANGE ORDER <br /> , „ w .. <br /> Project Number Project No. 11-6413 SA-5 Vault Modifications Change Order Number 4 <br /> To T.E. Roberts Inc. Contractor <br /> You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br /> Unless otherwise slated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> EXTRA WORK AT AGREED PRICE <br /> 1. Cost of additional work for the installation of the 18" pipe into the existing MWD vault. <br /> Discovered after excavating and removing concrete around the existing pipe coming out of <br /> the MWD vault that the pipe was in very poor condition and would need to be removed and <br /> a new spool made to transition to the City of Santa Ana pipe. Due to time needed to meet <br /> and agree with MWD on new spool and fabrication of new spool, it was determined for <br /> safety concerns to remove all shoring and backfill and compact the trench with CAB and <br /> pave trench and fully open the roadway. TE Roberts mobilized to site on 12/08/2023 to <br /> start work the work and completed the work on 1/16/2024. This work is detailed with <br /> Change Order Request#11. (6) days extension requested. <br /> TOTAL AGREED PRICE=$55,773.01 <br /> 2. Cost for additional work to Mobilize and redesign and fabricate the 18"CMLCSP SA 5 spool <br /> into the MWD vault. Installation of the spool, additional welding, additional confined space, <br /> additional ground water mitigation, additional traffic control, additional restoration and all <br /> material and labor to complete the installation of the new 18" CMLCSP into the MWD vault and <br /> connection to the City of Santa Ana pipe. This work is detailed in Change Order request#11. <br /> (5) days extension requested. <br /> Total Agreed Price=$102,761.64 <br /> TOTAL AGREED PRICE=$158,534.65 <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.