Laserfiche WebLink
EXHIBIT 5 <br />COST ANALYSIS <br />CONSTRUCTION OF THE PROJECT NO, 17-2674: CENTER STREET URBAN <br />GREENING <br />Construction Contract <br />$ <br />990,743.05 <br />Contract Administration <br />$ <br />53,611.95 <br />Ins ection and Testing <br />$ <br />95,000.00 <br />Contingencies <br />$ <br />99,075.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />1,238,430.00 <br />20A-103 <br />