Laserfiche WebLink
ELAN PROJECT <br />WATER SUPPLY ASSESSMENT NOVEMBER 2, 2017 <br />1 . WSA PURPOSE AND BACKGROUND <br />This Water Supply Assess ment (WSA) was prepared for Santa Anna First Street, LLC as the project <br />sponsor/applicant, and the City of Santa Ana ("City' or "Santa Ana") as the lead agency under <br />the California Environmental Quality Act (CEQA), by Fuscoe Engineering, Inc. (Fuscoe), as the <br />consultant, regarding the Elan Project ("Elan" or "Project"). This study is a requirement of <br />California law, specifically Senate Bill 610 (referred to as SB 610). SB 610 is an act that <br />amended Section 21 151 .9 of the Public Resources Code, and Sections 10631, 10656, 10910, <br />10911, 10912, and 10915 of the Water Code. SB 610 repealed Section 10913, and added <br />and repealed Section 10657 of the Water Code. SB 610 was approved by the Governor and <br />filed with the Secretary of State on October 9, 2001, and became effective January 1, 2002. <br />Under SB 610, WSAs must be furnished to local governments for inclusion in environmental <br />documentation for certain projects (as defined in Water Code 10912 [a]) subject to CEQA. Due <br />to increased population, land use changes and water demands, this water bill seeks to improve <br />the link between information on water availability and certain land use decisions made by cities <br />and counties. SB 610 takes a significant step toward managing the demand of California's <br />water supply as it provides regulations and incentives to preserve and protect future water needs. <br />The intent of this bill is to coordinate local water supply and land use decisions to help provide <br />California's cities, farms, and industrial developments with adequate water supplies. <br />With the introduction of SB 610, any project under CEQA shall provide a WSA if the project <br />meets the definition of the Water Code Section 10912. "Project" means any of the following: <br />• A proposed residential development of more than 500 dwelling units. <br />• A proposed shopping center or business establishment employing more than 1,000 persons <br />or having more than 500,000 square feet of floor space. <br />• A proposed commercial office building employing more than 1,000 persons or having more <br />than 250,000 square feet of floor space. <br />• A proposed hotel or motel, or both, having more than 500 rooms. <br />• A proposed industrial, manufacturing, or processing plant, or industrial park planned to house <br />more than 1,000 persons, occupying more than 40 acres of land, or having more than <br />650,000 square feet of floor area. <br />• A mixed -use project that includes one or more of the projects specified in this subdivision. <br />• A project that would demand an amount of water equivalent to, or greater than, the amount <br />of water required by a 500 dwelling unit project. <br />• If a public water system has fewer than 5,000 service connections, then "project" means any <br />proposed residential, business, commercial, hotel or motel, or industrial development that <br />would account for an increase of 10 percent or more in the number of the public water <br />system's existing service connections, or a mixed -use project that would demand an amount <br />of water equivalent to, or greater than, the amount of water required by residential <br />development that would represent an increase of 10 percent or more in the number of the <br />public water system's existing service connections. <br />After review of Water Code Section 10912, the Elan Project is deemed a "Project" because it <br />proposes a residential development of more than 500 dwelling units. <br />In addition, it is also necessary to include the recent passing (September 24, 2016) of Senate <br />Bill 1262 (Chapter 594) which acts to amend Section 66473.7 of the Government Code, and <br />FUSCOE tNGINEERING, INC. <br />