My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ONE BROADWAY PLAZA DEV.- EXHIBITS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/06/2004
>
ONE BROADWAY PLAZA DEV.- EXHIBITS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 12:33:14 PM
Creation date
7/23/2019 8:38:38 AM
Metadata
Fields
Template:
City Clerk
Item #
75E
Date
7/6/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
One Broadway Plaza Findings and Facts in Support of Findings <br />Environmental hnnact Report <br />■ Changes or alterations have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant environmental effect as identified in the EIR. <br />■ Such changes or alterations are within the responsibility and jurisdiction of another public <br />agency and not the agency malting the finding. Such changes have been adopted by such other <br />agency or can and should be adopted by such other agency. <br />■ Specific economic, legal, social, technological or other considerations, including provision of <br />employment opportunities for highly trained workers, make infeasible the mitigation measures <br />or project alternatives identified in the Final EIR. <br />2. Based on the Findings stated herein and information contained in the record, it is hereby <br />determined that: <br />a. All significant adverse impacts on the environment due to the approval of the project have <br />been eliminated or substantially lessened where feasible. <br />b. Any remaining significant adverse impacts on the environment found unavoidable are <br />acceptable due to the factors described in the Statement of Overriding Considerations in <br />Section 7.0, above. <br />10. APPROVALS <br />The City hereby tapes the following actions: <br />1. The City has certified the Final EIR for the project, as described in Section 1.0, above. <br />2. The City hereby adopts, incorporates into the project and makes a condition of the project <br />approval, all mitigation measures in the Final EIR, and as discussed in the Findings (Section 2.0, <br />above) and Project Impacts and Disposition of Related Mitigation Measures in the Final EIR <br />(Section 4.0, above). <br />The City hereby adopts the Mitigation Monitoring Program, accompanying the Final EIR and <br />discussed in the Findings (Section 5.0, above). <br />4. The City hereby adopts the Findings in their entirety, asset forth above, including the Statement <br />of Overriding Considerations, <br />5. Having certified the Final EIR, independently reviewed and analyzed the Final EIR, <br />incorporated mitigations into the project as conditions of project approval, and adopted the <br />Findings (including the Statement of Overriding Considerations set for herein), the City hereby <br />approves the One Broadway Plaza Project, as described in the Final EIR, including the site <br />approval and design. <br />U/vfregoso/wp51 /reports/One Broadway f nal findings Page 50 <br />June 28, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.