My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ONE BROADWAY PLAZA DEV.- EXHIBITS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/06/2004
>
ONE BROADWAY PLAZA DEV.- EXHIBITS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 12:33:14 PM
Creation date
7/23/2019 8:38:38 AM
Metadata
Fields
Template:
City Clerk
Item #
75E
Date
7/6/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated <br />Entity <br />Funded Prior <br />Description of Improvement <br />Cost (2004 <br />Responsible <br />to Indicated <br />Dollars) <br />For <br />Triggering <br />Im rovement <br />Event Cash <br />6. Restripe: (1) WB Santa Clara to provide <br />$50,000 <br />Owner <br />Building <br />one LT lane and one shared LT/RT lane; <br />Permit <br />(2) NB Grand Avenue from Fruit Street to <br />14`t' Street at Santa Ana Blvd/I-5 HOV <br />ramps to provide three NB travel lanes; (3) <br />I-5 NB off -ramps to provide a. WB LT lane, <br />a shared LT/RT lane and a RT lane at <br />Grand Ave. <br />7. Remove existing on -street parlung stalls <br />$300,000 <br />Owner <br />Building <br />and parking meters on Main Street from <br />Permit <br />Civic Center Dr. to Buffalo St., restripe and <br />slurry seal this Main Street segment to <br />provide three NB and two SB travel lanes, <br />and construct median on Mahn St. south of <br />loth Street. <br />S. Acquire necessary ROW and construct <br />$6,500,000 <br />Owner, <br />Final Map <br />southbound RT lane at Main/l7`1' and <br />unless City <br />Broadway/17t1, including striping, traffic <br />undertakes per <br />signal modification, and ADA compliant <br />section 5.1.1 <br />wheel chair ramps. <br />9. Implement neighborhood traffic plans to <br />$1,200,000 <br />City <br />Building <br />mitigate changes in traffic patterns or <br />(actual cost, <br />Permit <br />increased cut thorough traffic resulting .from <br />not in <br />the One Broadway Plaza Project in French <br />estimate) <br />Park, French Court, Willard, Floral Park, <br />West Floral Park, and Washington Square <br />Neighborhoods. Traffic plans costs shall <br />include traffic studies, stafftime to process <br />neighborhood traffic plan, and the <br />construction of appropriate semi-diverters, <br />diagonal diverters and street closures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.