My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2019-08-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
08/20/2019
>
FULL PACKET_2019-08-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 3:11:24 PM
Creation date
8/16/2019 2:02:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/20/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Engineer: Assisted Superintendent in the management of large pipeline <br />projects. Work included Sewer, Water and Storm Drain in all sizes ranging from <br />6" to 102" in steel, PVC, RCP and VCP. <br />Willlam JHarris Construction -Los Angeles, CA 1984 -1988 <br />Project Ranges: $50k - $500k <br />Labor Foreman: Supervised crews for both large and small commercial projects. <br />EDUCATION: <br />Contractors License - B - #633317 <br />California State University, Long Beach, CA 1988 -1991 <br />Emphasis on Construction Engineering Management <br />M.A.P.—Management Action Program Training 2006 <br />COMPUTER SHILLS <br />Bid2Win Estimating Software Microsoft Project Scheduling Software <br />Primavera Scheduling Software Microsoft Office <br />251-106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.