My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-26-18_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
11-26-2018
>
11-26-18_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 2:22:53 PM
Creation date
8/16/2019 2:22:23 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 26, 2018 <br />Comment on Environmental Impact Report, 2525 N. Main Street Multi-Family Residential Project <br />(aka Magnolia at the Park) SCH 2018021031, DP No. 2017-34 <br />page 11 <br /> <br /> <br />agency-approved methodology, not some other obsolete methodology. Endangered <br />Habitats League v. Orange (2005) 131 Cal.App.4th 777. <br /> <br /> Since the Project will create significant airborne cancer risks, a Revised Draft <br />EIR is required to analyze this risk and propose all feasible mitigation measures. <br /> <br />CONCLUSION <br /> <br /> For the foregoing reasons, and for the reasons set forth by other commenters <br />(which are incorporated herein by reference), the EIR for the Project is legally <br />inadequate. A revised draft EIR is required to analyze and mitigate the proposed <br />Project’s significant impacts. <br /> <br /> Sincerely, <br /> <br /> <br /> <br /> Richard Drury <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.