My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6 - GPA19-01; AA19-01_651 W SUNFLOWER AVENUE
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
04-22-19
>
6 - GPA19-01; AA19-01_651 W SUNFLOWER AVENUE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:40:29 PM
Creation date
8/16/2019 4:38:48 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sunflower Legacy Apartments – Mitigated Negative Declaration April 10, 2019 <br />Mitigation Monitoring and Reporting Plan Page 2 <br />1.3 Monitoring and Reporting Procedures <br /> <br />This MMRP includes the following information: (1) mitigation measures that will either eliminate <br />or lessen the potential impact from the project; (2) the monitoring milestone or phase during <br />which the measure should be complied with or carried out; (3) the enforcement agency <br />responsible for monitoring mitigation measure compliance; and (4) the initials of the person <br />verifying the mitigation measure was completed and the date of verification. <br /> <br />The MMRP will be in place through all phases of a project including project design <br />(preconstruction), project approval, project construction, and operation (both prior to and post - <br />occupancy). The City will ensure that monitoring is documented through periodic reports and <br />that deficiencies are promptly corrected. The designated environmental monitor will track and <br />document compliance with mitigation measures, note any problems that may result, and take <br />appropriate action to rectify problems. <br /> <br />Each mitigation measure is listed and categorized by impact area, with an accompanying <br />discussion of: <br /> The phase of the project during which the measure should be monitored; <br /> Project review and prior to project approval <br /> During grading or building plan check review and prior to issuance of a grading or <br />building permit <br /> On-going during construction <br /> Throughout the life of the project <br /> The enforcement agency; and <br /> The initials of the person verifying completion of the mitigation measure and date. <br />The MMP is provided as Table 1 (Mitigation and Monitoring Reporting Program). <br /> <br />6-134
The URL can be used to link to this page
Your browser does not support the video tag.