My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2019-09-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
09/03/2019
>
FULL PACKET_2019-09-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:09:19 AM
Creation date
8/30/2019 3:10:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/3/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award Contract to Aramexx Construction Civic Center Bike Boulevard and <br />Safe Routes to School Enhancements for Sepulveda Elementary School Projects <br />September 3, 2019 <br />Page 2 <br />DISCUSSION <br />The Civic Center Bike Boulevard Project is the result of a collaborative community effort in the <br />development of the Complete Streets Plan for Downtown Santa Ana. Extensive community <br />outreach was performed with a primary objective to improve safety and mobility for pedestrian and <br />bicyclists. The plan resulted in a number of pre -identified projects ready for grant consideration. <br />Complete Streets transform roadways originally designed to primarily serve vehicles into streets <br />which equally serve pedestrian and bicyclists, provide aesthetically pleasing public areas, and <br />result in community enhancements that help to establish vibrant neighborhoods. <br />The Civic Center Bike Boulevard stretches along Civic Center Boulevard from Broadway to <br />Santiago (Exhibit 1 and as shown below) connecting Downtown Santa Ana via the Lacy, Logan, <br />and French Park neighborhoods to the Santa Ana Regional Transportation Center. The <br />improvement consists of four neighborhood traffic circles/mini roundabouts at the intersections of <br />Minter Street, Lacy Street, Garfield Street, and Poinsettia Street. Safety and aesthetic features <br />include 10 new curb bulb -out extensions, 64 new curb ramps, 30 shortened crosswalks, and a new <br />crossing at French Street. In addition, the work will provide updated signs, striping, and markings <br />in the corridor, and an added protected left -turn arrow signal modification at intersection of Main <br />Street and Civic Center Drive. <br />23A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.