Laserfiche WebLink
1.1.1 MOWING <br />All turf shall be mowed weekly with mulching mowers. Subject to the approval of the City of Santa Ana, <br />the contractor may reduce the mowing frequency to biweekly during periods of rain or prolonged cold. <br />All grass clippings shall be left in place with the exception of large accumulations, which shall be <br />collected and removed after each mowing, All roadways adjacent to work areas shall be kept clean at <br />all times. <br />All turf shall be out to a height appropriate for the type of grass being mowed. Mowers shall be <br />maintained in optimum condition with sharp blades to provide a smooth, even cut without tearing of the <br />leaf blades. Turf shall only be mowed after two (2) consecutive non -watering days and/or as directed <br />by the City of Santa Ana. <br />Any and all signs found onsite or on trees shall be removed, including but not limited to political, garage <br />sale, lost and found, etc. All litter/debris shall be picked up prior to mowing, All turf and hardscape areas <br />including but not limited to the outside and inside perimeter of the City property including sidewalks and <br />streets shall be free of turf clippings, plant debris and trash at the end of the scheduled mow day. <br />1.1.2 EDGING AND DETAILING <br />Ali turf shall be edged with blade trimmer adjacent to all improved surfaces and, where no improved <br />surface exists, turf edges shall be maintained as if the turf area abuts a shrub bed or property line. <br />Edging and detailing shall be performed weekly. Following each edging, all edging debris shall be <br />removed, <br />Turf shall be mechanically edged during the mowing of each week, The edging along sidewalks, curbing <br />and other concrete shall be performed with a blade type edger. Sidewalks and other hard surfaces shall <br />be properly cleaned after each edging including grass stains or marks made as a result of the mowing <br />process. <br />Contractor shall flag all irrigation sprinklers prior to commencement of work. All turf growing adjacent <br />to irrigation hardware, tree trunks, or any other landscape amenity shall be neatly detailed by string <br />trimmer and/or chemicals to twelve (12) inches in all directions of said objects. Blade trimmers are <br />prohibited from usage twelve (12) inches around any tree, shrub, or establish plant base. If chemical <br />detailing is performed, the Contractor shall use the string trimmer to remove the treated turf within one <br />(1) week after symptoms of phototoxicity become recognizable. <br />Any damage, as determined by the City of Santa Ana, caused to irrigation components, sprinklers, <br />valves, etc., or plant material by edging equipment and/or mowers shall be replaced by the Contractor <br />at Contractor's expense. <br />1.1.3 FERTILIZATION <br />Lawns shall be fertilized four (4) times annually with a "complete fertilizer". Fertilize two (2) times per <br />year during the months of December and February using 22-3-9 at the rate of five pounds (5 lbs.) per <br />1000 square feet or approved equivalent program. During the months of June and October fertilize with <br />City of Santa Ana - RFP 19-948 <br />Landscape Maintenance Services of Water Facilities and Santa Ana Regional Transportation Center <br />15 <br />