My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SWAYZER CORPORATION
Clerk
>
Contracts / Agreements
>
S
>
SWAYZER CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 12:23:41 PM
Creation date
9/4/2019 5:08:00 PM
Metadata
Fields
Template:
Contracts
Company Name
SWAYZER CORPORATION
Contract #
A-2019-141
Agency
PUBLIC WORKS
Council Approval Date
8/20/2019
Expiration Date
8/19/2022
Insurance Exp Date
12/1/2019
Destruction Year
2027
Document Relationships
SWAYZER CORPORATION (3)
(Amended By)
Path:
\Contracts / Agreements\S
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
addition, a special notification listing exact starting date for renovation, pruning and other infrequent <br />operations, shall be furnished to the City of Santa Ana at least five (5) working days in advance of <br />performing these operations. <br />1. LEVEL OF MAINTENANCE <br />All work shall be performed in accordance with the HIGHEST INDUSTRY STANDARDS, as stated <br />in the enclosed maintenance specification description. Standards and frequencies may be modified <br />from time to time as deemed necessary by the City for the proper maintenance of the sites. <br />If, in the judgment of the City, the level of maintenance is less than that specified herein, the City <br />shall, at its option, in addition to or in lieu of other remedies provided herein, withhold appropriate <br />payment from the Contractor until services are rendered in accordance with specifications set forth <br />within this document and providing no other arrangements have been made between the contractor <br />and the City. Failure to notify of a change and/or failure to perform an item of work on a scheduled <br />day may result in deduction of payment for that date, week or month. Payment will be retained for <br />work not performed until such time as the work is performed to City standards. <br />The Contractor is required to correct deficiencies within the time specified by the City, If noted <br />deficient work has not been completed, payment for subject deficiency shall be withheld for current <br />billing period and shall continue to be withheld until deficiency is corrected, without right to <br />retroactive payments. <br />2. QUALITY OF WORK AND MATERIAL <br />All material and equipment furnished by the Contractor shall be new, high grade, and free from <br />defects and imperfections, unless otherwise hereinafter specified. Workmanship shall be in <br />accordance with the best standard practices. Both materials and workmanship shall be subject to <br />the approval'of the City of Santa Ana. All materials used shall be approved in advance by the City <br />of Santa Ana. <br />The City reserves the right to purchase materials directly and make them available to the Contractor. <br />In the event the City exercises the option to purchase the materials, the following conditions will <br />apply: <br />❑ Contractor shall conform to all City practices and procedures. <br />❑ Contractor shall comply to all safety regulations by City and CAL OSHA. <br />❑ All City purchases will be for the sole expressed use of and for the City. <br />❑ The Contractor shall secure, store, inventory, distribute and control all materials <br />entrusted to the Contractor's representatives. All materials and inventories shall <br />be made available to the City upon request. <br />3. SUPERVISION OF CONTRACT <br />All work shall meet with the approval of the City of Santa Ana. Any specific problem area which <br />does not meet the conditions of the specifications set forth herein shall be called to the attention of <br />City of Santa Ana - RFP 19,048 <br />Landscape Maintenance Services of water Facilities and Santa Ana Reglonal Transportation Center <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.