Laserfiche WebLink
rash I and Disoosal <br />All litter and unwanted natural or environmental materials shall be removed from site <br />and disposed according to applicable laws, codes, and requirements. Workors will <br />Inspect each site for safety hazards as they perform their daily task, <br />kddqt g bwa nca <br />Our Irrigation technician will maintain all Irrigation systems automatic controllers and <br />manual systems throughout the city on a weekly scheduled basis. The technician will <br />survey and adjust watering periods to properly Irrigate planters and turf areas. <br />Technicians and all staff will comply with the City of Santa Ana's water conservation <br />requirements, All irrigation plumbing Including main and lateral lines, valves, sprinkler <br />heads, fitting shall be repaired and replaced as needed. All leaks or other malfunctions <br />shall be corrected with In 24 hours. An emergency number shall be provided for any <br />irrigation emergencies that occur. Our Irrigation technician will keep a log of each <br />controller and will compile a monthly report. <br />Irrigation shall be scheduled between hours specified in the RFP, <br />Wit, Control <br />On -site staff will perform weekly surveys of all landscaped areas for pest problems, if a <br />pest problem arises staff wilt notify supervisory staff and our pest control advisor (POA) <br />will make a recommendation, Our PCA will make recommendations using integrated <br />pest management practices in accordance with the Department of Pesticide Regulation <br />and the City of Santa Ana. If necessary, all pesticide applications will be made or <br />supervised by a qualified applicator (OAL), <br />If awarded and prior to start, a detailed work schedule will be submitted to the City of <br />Santa Ana for approval. Changes to the planned schedule will be submitted to the city <br />at least 24 hours prior to work, <br />Wo <br />k a!5 a, <br />Our staff will conduct weekly safety meetings concerning proper procedures for working, <br />Work site safety is strongly enforced by our supervisors and management staff. We <br />provide all staff with required personal protection equipment required by OSHA. All <br />vehicles are supplied with first aids kits for any incidence that may occur. We will <br />Inspect work sites daily for unsafe conditions and take the necessary actions to fix the <br />issue. <br />Traffic Controls <br />Our lead employees will enforce necessary standards and guidelines for traffic controls <br />In accordance with the Manual on Uniform Traffic Control Devices (MUTCD). We will <br />provide a mounted arrow board for all lane closures, if necessary. <br />8 <br />