My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PAULUS ENGINEERING, INC. (2)
Clerk
>
Contracts / Agreements
>
P
>
PAULUS ENGINEERING, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2021 2:25:36 PM
Creation date
9/4/2019 5:17:48 PM
Metadata
Fields
Template:
Contracts
Company Name
PAULUS ENGINEERING, INC.
Contract #
A-2019-142-02
Agency
PUBLIC WORKS
Council Approval Date
8/20/2019
Expiration Date
8/19/2022
Insurance Exp Date
5/1/2022
Destruction Year
2027
Document Relationships
PAULUS ENGINEERING, INC
(Amended By)
Path:
\Contracts / Agreements\P
PAULUS ENGINEERING, INC (2)
(Amended By)
Path:
\Contracts / Agreements\P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E T➢ CPt'_ og',. It1C. TIME& MATERIAL WORKSNBBT TM No, <br />Job No. <br />Customer. Project: <br />Work AUlhonzed by, Work Date: <br />sc 04 Foremen: <br />Pravalling <br />WIY LABOR <br />R 0 RA <br />01T RATE <br />IDOL <br />TM AATEIREOtOTAL <br />O/T <br />-. AL - OL TM TOTAL <br />Laborer <br />$ 18,42 <br />$ 117A3 <br />$ <br />166.64 <br />$ <br />- $ <br />- $ <br />Plpolayer <br />$ 83.72 <br />$ 126,50 <br />$ <br />167.44 <br />$ <br />- S <br />- $ - <br />Operator <br />$ 96.59 <br />$ 144.89 <br />$ <br />103.15 <br />$ <br />• $ <br />$ <br />Truck Driver <br />$ 06.59 <br />$ 144.89 <br />$ <br />193.18 <br />5 <br />- $ <br />S - <br />Foramen <br />0 107.38 <br />$ 10LO7 <br />$ <br />214.78 <br />$ <br />• $ <br />$ - <br />Superintondont <br />$ 120,68 <br />$ 180.07 <br />S <br />241,10 <br />$ <br />- $ <br />$ - <br />Subtotal <br />$ <br />$ <br />$ <br />Mark Up^% <br />16% <br />$ <br />- $ <br />5 <br />TOTAL $ $ $ <br />$ Y BARE GUTf$M€NT I <br />AMT. <br />WNIT <br />'OTAL <br />Da1846 excavator <br />MR <br />$ <br />226,00 <br />$ - <br />Compaction Wheel <br />MR <br />$ <br />46,D0 <br />$ <br />Hitachi 4001A50 Excavator <br />HR <br />$ <br />186.00 <br />$ <br />Compaction Wheal <br />HR <br />$ <br />40.00 <br />$ - <br />Cat 240/330-Yutan1320 Excavator <br />HR <br />$ <br />140,00 <br />$ <br />Compaction Wheel <br />HR <br />$ <br />40.00 <br />$ - <br />Cot 902Wheal Loader <br />HR <br />$ <br />127AO <br />6 - <br />Cat 950 Wheal Loader <br />HR <br />$ <br />110.OD <br />$ - <br />LowbedTractdnTrailer <br />HR <br />$ <br />96.00 <br />$ - <br />CatBackhoe <br />HR <br />$ <br />88.00 <br />-$ <br />Compaethr W11e01 or Breaker <br />HR <br />$ <br />30.0D <br />$ - <br />Doom Truck <br />HR <br />$ <br />52.00 <br />$ - <br />Super 10 Dump Truck <br />HR <br />$ <br />125,00 <br />$ <br />6 Wheel Dump Truck <br />HR <br />$ <br />62.00 <br />$ <br />6 Wheel Fiat Sod Truck <br />HR <br />S <br />45,00 <br />$ - <br />Roller <br />MR <br />$ <br />65.00 <br />$ - <br />Crew Truck MthToole <br />MR <br />$ <br />40.00 <br />$ - <br />DeliveryTmck <br />HR <br />$ <br />36.00 <br />$ - <br />VectorPumpTruck <br />HR <br />S <br />145.00 <br />$ - <br />Miss roots <br />Shoring Jacks - per each <br />Day <br />$ <br />13.OD <br />$ - <br />TrenchPlates- per each <br />Day <br />$ <br />13.00 <br />$ - <br />Tcench Shleld <br />Day <br />$ <br />158.00 <br />$ - <br />Manhole Shield <br />Day <br />$ <br />99.00 <br />$ <br />3" Pump w/Qonnecters <br />Day <br />$ <br />109.00 <br />$ - <br />K•Roll <br />LF <br />$ <br />18.00 <br />$ - <br />Generator <br />Day <br />$ <br />92.00 <br />$ - <br />AlrCampreesor <br />Coy <br />'. $ <br />136.00 <br />S - <br />AirBlowar <br />Day <br />$ <br />70.00 <br />$ <br />Confined Space Equipment <br />Day <br />$ <br />768.00 <br />$ - <br />©as Detection Equipmont <br />- Day <br />$ <br />69.00 <br />$ - <br />TrafficArrowSoard <br />Day <br />$ <br />125,00 <br />$ - <br />TraH➢oBerricedes <br />Day <br />$ <br />2.26 <br />$ - <br />TroffIc ConeS/Delineatore <br />Day <br />$ <br />2,26 <br />$ - <br />WalkBehindVibratoryPlate <br />Day <br />$ <br />81.00 <br />$ - <br />Miss Small Tools <br />Day <br />$ <br />70.00 <br />$ - <br />Subtotal <br />Mark Up % <br />151 <br />_$ <br />$ - <br />TOTAL $ <br />EN-T= MATERIAL. SUBCONTRACT MISC Unit IOTA <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />Subtotal... <br />Mark Up %a 16% $ <br />TOTAL $ <br />Total Overhead l Pro0t <br />TtlTALWORKSHEET $ <br />
The URL can be used to link to this page
Your browser does not support the video tag.