Laserfiche WebLink
"' MAWTAW PROP.R�M'ARY CONT1DEtFf1ALITY •rr•. <br />BNSFRAILWAY COMPANY <br />FHPM ESTIMATE FOR <br />SANTA ANA <br />LOCATION IRVINEINDPARK DETAILSOFSSN}IAT➢ <br />PLAN ITEM: 000295565 VERSION: 6 <br />PURPOSE, JUST6[CAT10N AND DESCIUPfiON <br />OVER ROAD . SANTA ANA, CA; REPLACE CONSTANT WARNING I FLASHERS/ GATES; CALIFORNIA DIV: SAN DIEGO SUBDIV; LS 7655; MP <br />I763; DOT# o2b711U, SEQ# 69618 <br />MONTHLY POW ER UR1.17Y COST CENTER : 61692. <br />THE MATERALLIST BELOW REFLECTS TYPICAL REPRESENTATIVE PACRAGES USED FOR ESTIMATING PURPOSES ONLY, <br />THIS ESTIMATE 15 GOOD FOR ISODAYS. THEEST/MLATE IS EUDIECFTO CHANCE IN COST FOR LABOR, MATERIAL, AND OVERGEAD. <br />CONTRACTS HAVE BEEN ESTABLISHED FOR PORTIONS OF SIGNAL WORK ON THE DNSF RAILROAD. <br />«•..•.,....w.............••• SIGNAL WORK ONLY...........w«. •• .•o-.ww«. <br />THE C 17Y OF SANTA ANA IS FUNDING 10o%OF THIS PROTECT. <br />MARMAIN PROPRIETARY CONFIDENTTALIIY, <br />PRIMARY FUNDING SOURCE IS FHWA <br />•• BUY AMHRTCA@T APPLIES -- <br />DESCRIPTION <br />LABOR <br />SIGNALFIELD-REPLACE <br />SIGNALSHOP LABOR. CAP <br />PAYROLLASSOCLATED COSTS <br />DAOVERHEADS <br />EQUIPMENT EXPENSPS <br />INSURANCE EXPENSES <br />TOTALLABORCOST <br />MATERIAL <br />muu«••w <br />ARRPSTOH MDSA I XS <br />BATTERY, 20 VGL- S,9 VGL.350 <br />BELLS <br />BONDING MATERIAL <br />BUNGALOW 8X8 W/AC <br />13UNCALOWNIATBIUAL <br />CABLF. 217/6 TOY <br />CABLE, 3C/2 <br />CABLE. 5C/10 <br />CABLE, JOY, <br />CABLE, 7C/14 <br />CANTILEVER <br />CHARGERS, 12/80 (20/40/60) <br />CONDUIT,ST'EELe <br />CONSTANT WARNINO,XP4, ITK <br />BLECTRICAL MATERIAL <br />EVENT RECORDER <br />FIETD MATEHWL <br />PILL DIRT <br />FOUNDATION,CANT I <br />FOUNDATION, STEEL <br />GATEKEEPER <br />OATH MECHANISM, 5-60 <br />EAWK 48 DIN <br />LEDLIGHT <br />IfGHT OUT DETBCTOR <br />RELAY <br />SHUNT, N➢S <br />SURFACE ROCK <br />Page 4 of 5 <br />Ulm <br />952.0 MII <br />0.01 MH <br />1.0 EA N <br />1.0 LS N <br />4.0 EA N <br />1.0 LS N <br />1.0 LS N <br />1.0 LS N <br />500.0 FT N <br />250.0 FTN <br />500.0 PT N <br />1000.0 FT N <br />1000.0 FT N <br />2.0 EA N <br />3.0 RA N <br />2000 IT N <br />1.0 EA N <br />1.0 LS N <br />1.0 EA N <br />1.0 LS N <br />20.0 CY N <br />20 EA N <br />4.0 EA N <br />4.0 EA N <br />4,0 EA N <br />1.0 EA N <br />78.0 EA N <br />2.0 EA N <br />4.0 EA N <br />20 EA N <br />10.0 CY N <br />COST TOTALS <br />29,351 <br />19,186 <br />31,855 <br />6,527 <br />92,056 <br />697 <br />6,763 <br />823 <br />Soo <br />10,142 <br />7,564 <br />610 <br />1,453 <br />940 <br />4,130 <br />1,740 <br />31,650 <br />3,110 <br />3,064 <br />IS,= <br />1,500 <br />3,250 <br />7,372 <br />son <br />6,63fi <br />2,693 <br />6,643 <br />21,891 <br />1,930 <br />5,111 <br />1,826 <br />3,000 <br />.Zola <br />500 <br />9Z056 <br />20B-25 <br />