My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH KARA GRANT APPEAL
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
75A - PH KARA GRANT APPEAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 5:26:14 PM
Creation date
10/10/2019 4:53:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
10/15/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
engineering <br />group, ine. <br />September 19, 2019 <br />Kara E. Grant, <br />LAW OFFICE OF KARA E. GRANT <br />17595 Harvard, Suite C-202 <br />Irvine, CA 92614 <br />Subject: 301 and 325 North Tustin Ave, Santa Ana Project <br />(CUP 2019-30 and CUP 2019-31) Traffic Study and Noise Review <br />Dear Ms. Grant: <br />INTRODUCTION <br />RK ENGINEERING GROUP, INC. (RK) has reviewed the traffic study and noise information <br />for the 301 and 325 North Tustin Avenue Convenience Store and Express Car Wash Project <br />located in the City of Santa Ana. The proposed project would construct a new service <br />station with a 3,040 square foot convenience store and a new automated car wash located <br />at 301 and 325 North Tustin Avenue in the City of Santa Ana. Previously the City reviewed <br />a Commercial Building for the site, however, that has now been changed to the Express <br />Car Wash. In the past, there was a gas station with a market and a restaurant operating at <br />the site. The major concerns with the project is traffic and noise impacts as a result of the <br />car wash component of the project. <br />A Staff Report and traffic study were previously prepared for the project. The modified <br />project traffic study was prepared by L L & G Engineers in a revised report dated May 17, <br />2019. No Noise Technical Study was prepared for the processing of the project through <br />the City. The original project included a Commercial Building, however, is now proposed to <br />be an Express Car Wash. The proposed project with a Car Wash will generate more traffic <br />than the originally proposed project with the commercial building. RK has reviewed the <br />project information for the revised project with respect to traffic impacts, parking, overall <br />transportation/circulation and noise/vibration impacts to the surrounding study area. <br />The primary issues with the proposed Express Car Wash Project include the following major <br />items: <br />Express Car Wash projects have their peak traffic generation on Saturday <br />afternoons. No Saturday traffic analysis was performed for the project. <br />The Near -term traffic analysis for Year 2019 is not realistic and a later timeframe <br />should be analyzed. <br />75A-67 <br />