My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2019-10-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
FULL PACKET_2019-10-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2019 4:13:58 PM
Creation date
10/11/2019 10:29:44 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
10/15/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. The following are requirements that will need to be addressed and/or approved <br />by the Public Works Agency prior to issuance of a building permit: <br />Prior to issuance of a building permit, submit a site plan that shows compliance <br />with trash services including: <br />a. Depict trash trucks turning radius on the all proposed internal corners <br />b. 42 feet on a 90-degree turn radius <br />c. Minimum 11 feet, 6 inches lane width for turn radius <br />d. For roll out service the desired path of travel for the bin must be level with <br />no "lips" or major elevation changes <br />e. Minimum one time a week service adequate for all waste to be contained <br />within the bins, adjustments to the number of yards required for service <br />are at the discretion of the City and Waste Management <br />f. The maximum number of pick-ups is 2 times per week. <br />Resolution No. 2019-35 <br />75A-307 Page 9 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.