My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2019-10-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
FULL PACKET_2019-10-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2019 4:13:58 PM
Creation date
10/11/2019 10:29:44 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
10/15/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 3-1 <br />LEVEL OF SERVICE CRITERIA FOR SIGNALIZED INTERSECTIONS <br />Level of Service <br />(LOS) <br />Intersection Capacity <br />Utilization Value (V/C) <br />Level of Service Description <br />EXCELLENT. No vehicle waits longer <br />A <br />< 0.600 <br />than one red light, and no approach phase is <br />fully used. <br />VERY GOOD. An occasional approach <br />B <br />0.601 — 0.700 <br />phase is fully utilized, many drivers begin <br />to feel somewhat restricted within groups <br />of vehicles. <br />GOOD. Occasionally drivers may have to <br />C <br />0.701 — 0.800 <br />wait through more than one red light, <br />backups may develop behind turning <br />vehicles. <br />FAIR. Delays may be substantial during <br />portions of the rush hours, but enough <br />D <br />0.801 — 0.900 <br />lower volume periods occur to permit <br />clearing of developing lines, preventing <br />excessive backups. <br />POOR. Represents the most vehicles <br />E <br />0.901 — 1.000 <br />intersection approaches can accommodate, <br />may be long lines of waiting vehicles <br />through several signal cycles. <br />FAILURE. Backups from nearby locations <br />or on cross streets may restrict or prevent <br />F <br />> 1.000 <br />movement of vehicles out of the <br />intersection approaches. Potentially very <br />long delays with continuously increasing <br />queue lengths. <br />75A-398 <br />
The URL can be used to link to this page
Your browser does not support the video tag.