My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.S. LEGACY CONSTRUCTION, INC. (CENTER STREET URBAN GREENING PROJECT)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
C.S. LEGACY CONSTRUCTION, INC. (CENTER STREET URBAN GREENING PROJECT)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 10:26:25 AM
Creation date
10/23/2019 3:51:41 PM
Metadata
Fields
Template:
Contracts
Company Name
C.S. LEGACY CONSTRUCTION, INC. (CENTER STREET URBAN GREENING PROJECT)
Contract #
P17-2674
Agency
Public Works
Council Approval Date
7/16/2019
Expiration Date
1/1/1900
Document Relationships
20A - AA - PROJ CENTER STREET URBAN GREENING
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\07/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 17-2674 Center Street Urban Greening Change Order Number 1 <br />To C.S Legacy Construction Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />1. Added cost for FilterPave glass pervious pavement color modification. (PCO #3) <br />TOTAL AGREED PRICE = $4,300.00 <br />2. Added cost for adding an extra 1" base layer under the 2" pervious pavement. (PCO #3) <br />TOTAL AGREED PRICE = $4,795.35 <br />3. Change the seeding from 801b. & 401b. seeding to 120lb/AC. Seeding. (PCO #4) <br />4. Electrical design modification per delta 1. (PCO #8) <br />EXTRA WORK AT TIME & MATERIAL <br />1. Lighting conduit upsize.(PCO #1) <br />TOTAL AGREED PRICE = $813.05 <br />TOTAL AGREED PRICE = $25,650.00 <br />TOTAL AGREED PRICE = $232.30 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.