<br />San Lorenzo Sewage Lift Station (05-3610), bidding on July 9, 2019 2:00 PM (Paolflo)
<br />Printed 00/1512019
<br />81dResults
<br />EXHIBIT A
<br />Type Item Code UOM Qty
<br />Unit Price
<br />Line Total Comment
<br />19 Provide and Maintain Traffic Control
<br />LS 1
<br />$50.000.00
<br />$50,000,00
<br />20 Prepare and Implement Stormwater Pollution Prevention Plan
<br />LS 9
<br />$20,000.00
<br />$20,000.00
<br />21 Removal of Existing Median/Landscaping, Construct Temporary Pavement including Re striping, and
<br />Replacement of Median and
<br />Landscaping
<br />LS 1
<br />.-................,......,..w...,.........,,.....,..,.,,..,.,....,,,.,..,,.....-.......,..,...,.--.._.......,.........w,.,.-,...,.,...........»_._.,.,,.........
<br />$130,000.00
<br />$130,000AO
<br />22 Removal and Replacement of Concrete Bus Pad
<br />..
<br />LS 1
<br />$30,000.00
<br />$30,000.00
<br />23 Removal and Replacement of Curb, Gutter, Sidewalk and Medians
<br />LS 1
<br />$181000100
<br />$18,000.00
<br />24 Replacement ofTraffic Lopps, Detectors and Wiring
<br />LS
<br />1
<br />$16,000,00
<br />$15,000.00
<br />25
<br />Construct Grind and ARHM Overlay
<br />Sp
<br />44000
<br />�.
<br />$2.25
<br />.„.. _.. ,..........«.„.....
<br />$09,000.00
<br />,,..,........,,_...........,
<br />26
<br />Furnish and Install Final Striping and Replacement of Pavement Maarkirki...,._,..,_.._
<br />ngs
<br />W....,..,.....,.
<br />. ,.., ..�...
<br />LS
<br />... ...._.
<br />1
<br />__... .. ,.._.....M,.
<br />$15,000.00
<br />..._...... ._
<br />$16,000.00
<br />...
<br />27
<br />TV Inspection of Gravity Sewer Mains
<br />.,......._. .......,., .. _.,.,..,.,..,,..�
<br />LS
<br />1
<br />$6.000,00
<br />$6,000.00
<br />28
<br />Potholing
<br />LS
<br />1
<br />$50,000.00
<br />$60,000.00
<br />29
<br />Over•Exosvation and Subgrade Stabilization of Trenches *
<br />Cy
<br />100
<br />$226,00
<br />$22.600.00
<br />30
<br />Construction Staking
<br />LS
<br />1
<br />$30,000.00
<br />$30,000.00
<br />31
<br />Start-up, Testing and Training
<br />LS
<br />1
<br />$15,000.00
<br />$16,000.00
<br />32
<br />As Built Plans, O&M Manuals and Warranties
<br />LS
<br />1
<br />$5,000,00
<br />$6,000.00
<br />33
<br />Permits
<br />LS
<br />1
<br />$20,000AO
<br />$20.000,00
<br />34
<br />Labor Agreement Oversight
<br />LS
<br />1
<br />$10,000,00
<br />$10,000.00