Laserfiche WebLink
P, 1 <br />DocuSign Envelope ID: F19609F1-A068-4905-8035-OA90C64F3BE6 <br />9. Additional cost for Landscape Power Source Conduit; Reference RFI No. T185; Reference COR T034. <br />AGREED PRICE: $4,188.25 <br />10. Additional cost for added stub out for traffic loops; Reference RA No. T186; Reference COR T035. <br />AGREED PRICE: $5,551.51 <br />Page 2 of 3 <br />