Laserfiche WebLink
APPEN-DIX _ <br />TT•A CFTM t+I�[T 1-111;-. JLI, 01!111 tCT1K`i'�I1.C"rY)OASJ[U11I <br />A high level appearance and a seta surface underfoot require scheduled, daily preventative maintenance as specified below, <br />1, Gyntnnsluatt General -• Daily Malntenaace <br />a, Clean walls and doors free of smudges, ball marks, and any other marks. <br />b. Clean any fixtures and/or appurtenances by wiping them flee of marks, dust or any other unclean material. <br />o. Clean bleachers of trash, spills, stains, dust, dirt, etc. Wipe down bleachers handrails, <br />& Clean, sanitize, and polish all steel surfaces Including but not limited to metal hardwaro, door <br />handles/plates, etc, <br />e, Clean all interior and exterior door glass, <br />f. Polish all panic bars and kick rails, <br />2. Gyttanaslum General— Weekly Matlntettance <br />a. Dust vents and other appurtenances up to 12' high, <br />b, Clean and disinfect wall coverings, dust, marks, etc, up to 12' high, <br />c. Wipe down baseboards free of dust, marks, etc. <br />d. Clean basketball backboards free of smudges, ball marks, dust, etc. <br />I GymnaskanFloor-Daily <br />a, AgIll„n- Contractor shall provide and replace as often as necessary U.S. Matt & Itubbor Corporation <br />entrance guard mats (or approved equal) at each outside and inside entry (loot directly leading into the <br />gymnasium. Tho mats will be sired to cover the entire width of all doors in order to protect the gymnasium <br />floor from dirt, moisture, and Other materinls harmful to the gynmashtm floor, <br />b. Dust Mo )i .it-. An essential elernent of preventative maintenance of wood sports flooring is daily dust. <br />mapping. <br />i. Contractor shall use Algoma Mop Manuf,,cturors "Mariner" mops (or approved equal) that have <br />been treated with Hillyard Super Hil-Tone, Hit -Mist, or Hill -Treat products, to remove dirt and grit <br />that acts like sandpaperundet•t'oot in wearing away the gloss and protective coating on tlta flooring. <br />Contractor shall clean the entire gyms asiam wood floor surface daily, <br />ii. Contractor shall ftrat dust mops by following manufacturer instructions. Dust mops must never be <br />used inunedistety after being treated. Contractor shall rotate dust maps daily. Contractor ahall <br />always brush out or vaurrur a the dust mops after each daily use, retreat the mop, and hang overnight <br />for the next use. <br />o, Spy Muuptig and Panm Moo 'ne- Contractar shall also provide daily preventative maintenance of <br />gyntnasiam wood sjaorts nicer rig by remaving spills acrid sail drat daily dust' inappltag does not iemave. It <br />IS important to remove spills as soon as passible to prevent slips and falls. pot reanoval of laEoad, fecal <br />atelier, urine, and otherpotentially infecaaus meter als as outlined in OSHA Ragcrlatioa 29 CFR 1910.1030, <br />Contractor shall use t1to Hillyatd Bodily I']tuid 17ispasel I£it (blfr✓Pruduat No. f1IL001ff2t?4) <br />4. Gynrnaslurn Floor— Weekly <br />a, Map the entire Wynn floor once every two weeks using a ratio of I-gallan warm water to 1 •cup white vinegar <br />to 1-cup rubbing alcohol. Change water frequently to avoid mopping with dirty water, thereby, spreading <br />dirt and grime throughout lrym floor. <br />City of Santa Ana RFP 19"07777 <br />Attachment i-E <br />