Laserfiche WebLink
Salas, Diana <br />From: Diane Fradkin <dianefradkin@hotmail.com> <br />Sent: Monday, November 18, 2019 11:51 AM <br />To: eComment <br />Subject: Fw: 2525 N. Main Street - Is this project going to create a Public Safety issue??? <br />Attachments: 2525 N Main Revised project access.pdf <br />From: Diane Fradkin <br />Sent: Saturday, November 16, 2019 1:15 PM <br />To: mpulido@santa-ana.org <mpulido@santa-ana.org>; jvillegas@santa-ana.org <jvillegas@santa-ana.org>; <br />vsarmiento@santa-ana.org <vsarmiento@santa-ana.org>; ciglesias@santa-ana.org <ciglesias@santa-ana.org>; <br />dpenaloza@santa-ana.org <dpenaloza@santa-ana.org>; JSolorio@santa-ana.org <JSolorio@santa-ana.org>; <br />pbaccera@santa-ana.org <pbaccera@santa-ana.org> <br />Subject: 2525 N. Main Street - Is this project going to create a Public Safety issue??? <br />Good Afternoon Honorable Mayor & Councilmembers: <br />The Staff Report package, which was made available by the Planning Department yesterday November 15th, <br />has 4 sections. The proposed project details are located in the last section..... section 4. <br />I'd like for you to focus on the revised site plan ..... one item which jumps out has to do with site access (see <br />attachment) including the new off -set intersection and new curb cut/traffic circulation/traffic study. <br />This new redesign includes these items below (but are certainly not limited to lust these items): <br />1) The off -set intersection at Walkie Way & Main Street <br />2) North & South left turn turn -pockets at Walkie Way & Main Street (and reconfiguration of left turn pocket <br />from Main Street onto Edgewood) <br />3) The new curb cut on Main Street closer to Edgewood <br />4) Surface parking for Discovery Center patrons <br />These 4 items above were not included in the original DEIR as they are new to the project. They have not been <br />subjected to the 45 day public review process per CEQA since they were not included in the original DEIR. This <br />could result in a legal issue for the City having an inadequate EIR for this project. <br />However, the bigger issue from these redesign items have to do with Public Safety. The close proximity of 7 <br />traffic lights along the stretch of Main Street from Edgewood to La Veta could pose a significant issue with Fire <br />and Police during certain high peak traffic times. <br />Also, the stacking when cars are trying to turn left into the proposed project, Discovery Center or into Park <br />Santiago neighborhood will be an issue due to the staggered intersection at Walkie Way which will cause a <br />back up on both sides of Main Street during high peak traffic times due to the short left turn pockets. The <br />park access for Santiago Park is through the entrance of the proposed project.... this is another cause for <br />concern as it will be confusing for drivers trying to access the park. <br />