Occupancy Vehicle (HOV) Improvement project that is planned to be completed in 2020. This project includes the <br />addition of one continuous HOV lane in each direction along the northbound and southbound 1-5 between SR-55 and <br />SR-57 and the 1-5 HOV northbound entrance and southbound exist ramps at the intersection of N. Main <br />Street/Edgewood Road-1-5 Ramps have been removed. <br />Project Trip Generation <br />The vehicle trip generation rates are from the Institute of Transportation Engineers' (ITE) Trip Generation (10th <br />Edition) and are based on Land Use 221 - "Multi -family Housing (Mid -Rise)", which is consistent with the EIR analysis. <br />Table T-1 shows that 278 units (22 units more than the Modified Project of 256 units) is estimated to generate 79 <br />fewer a.m. peak hour trips, 96 fewer p.m. peak hour trips, and 1,186 fewer daily trips than the Original Project. <br />Table T-1 Comparison of Vehicular Trip Generation <br />Land Use <br />A.M. Peak Hour <br />P.M. Peak Hour <br />Dail <br />tal <br />In <br />Out <br />Total <br />TripGeneration Rates <br />0.36 <br />0.27 <br />0.17 <br />0.44 <br />5.44 <br />Or inal Project TripGeneration 496 units <br />a461 <br />179 <br />JT10770 <br />133 <br />86 <br />219 <br />2,698 <br />Modified Project Tri Generation 278 units <br />00 <br />75 <br />48 <br />123 <br />1,512 <br />Reduction in Tri s <br />58 <br />38 <br />96 <br />1,186 <br />Source: Trans lutions, 2019. Attachment B. <br />Because the Original Project resulted in less than significant traffic impacts, and the Modified Project would result in <br />fewer peak hour and daily vehicular trips, the Modified Project would not result in any new or increased traffic impacts. <br />Although the intersection of N. Main Street and Walkie Way would be modified to accommodate southbound left turns <br />into the Project site, the traffic analysis modeling shows that the existing roadway network would be able to <br />accommodate the change, as none of the traffic criteria thresholds would be exceeded, as detailed below. Therefore, <br />no new or increased transportation, traffic, or circulation impacts would occur from implementation of the Modred <br />Project. <br />Existing Plus Modified Project <br />Intersections: In the existing plus project with the Modified Project condition, Table T-2 shows that all of the study <br />area intersections are forecast to operate at satisfactory levels of service except for the SR-22 eastbound ramps at <br />Town and Country Road in both the a.m. and p.m. peak hours. This intersection is under the jurisdiction of Caltrans <br />and currently operates at an unsatisfactory LOS E in the a.m. peak hour and LOS F in the p.m. peak hour. With the <br />addition of traffic from the Modified Project, the intersection would continue to operate at an unsatisfactory LOS E in <br />the a.m. peak hour and LOS F in the p.m. peak hour. This is the same conditions that would occur by the Original <br />Project, as shown in Table 4.11-9 of the DEIR. Therefore, like the Original Project, the Modified Project would not <br />result in exceedance of the Caltrans criteria, and no impacts at other intersections would occur in the existing plus <br />Modified Project condition. Thus, overall impacts would be less than significant. <br />Roadway Segments: In addition, as shown in Table T-3, all study area roadway segments are forecast to operate at <br />satisfactory levels of service and implementation of the Modified Project would not cause an exceedance of LOS <br />criteria on any of the roadway segments in the traffic study area. Therefore, impacts to roadway segments in the <br />existing plus Modified Project scenario would also be less than significant, which is consistent with the EIR findings <br />identified in DEIR Table 4.11-10. <br />Queueing: As described previously, the Modified Project would implement changes to the Main Street and Walkie <br />Way intersection geometrics that would provide a left turn into the Project site. This would result in a reduction in the <br />storage length for the northbound left turn and the northbound through lanes at the intersection of Main Street/Walkie <br />Way -Driveway, and for the southbound through lanes at the Main Street/Edgewood Road intersection by <br />approximately 90 feet. Table T-4 shows the queueing in the existing without and with Modified Project conditions. As <br />