My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH - 2525 N MAIN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
11/19/2019
>
75D - PH - 2525 N MAIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 7:54:38 PM
Creation date
11/14/2019 5:55:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
11/19/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Queueing: As described previously, construction of the Modified Project includes changes to the N. Main Street at <br />Walkie Way intersection to provide a left turn into the Project site and changes to the median to provide adequate <br />storage length. Table T-11 provides the queueing in the year 2040 plus Modified Project condition. As shown, all <br />queues are forecast to fit within the storage length, except for the southbound left turn at Main Street and Edgewood <br />Road in the p.m. peak hour with the existing median. An exceedance of the storage length by 11-feet is forecast to <br />occur in the p.m. peak hour without the Modified Project. With Modified Project, the exceedance would increase by 3 <br />feet in year 2040 conditions. As detailed in Section 2, Modifications to the Original Project, the median would be <br />modified to accommodate these queues. Thus, operation of the Modified Project would result in a less than <br />significant impact related to queuing. In addition, this operational condition is improved in comparison to the <br />conditions that would occur from implementation of the Original Project Option A, which included one driveway to the <br />Project site that was sited along N. Main Street, and resulted in a p.m. peak hour queue of 235 feet (71 feet greater <br />than the queue of 164 feet shown in Table T-11). Therefore, no new or greater impacts related to queuing would <br />occur from implementation of the Modified Project. <br />Table T-11: Year 2040 with Modified Project Queuing <br />Without Project <br />With Project <br />AM Peak <br />PM Peak <br />AM Peak <br />PM Peak <br />Storage <br />Length <br />Hour <br />Hour <br />Hour <br />Hour <br />Queue <br />Queue <br />Queue <br />Queue <br />(In <br />Intersection <br />Movement <br />Feet) <br />Length' <br />Length' <br />Length' <br />Length' <br />Main Street/Memory Lane <br />NBT <br />680 <br />294 <br />578 <br />416 <br />590 <br />Main Street/Walkie Way <br />NBL <br />150 <br />44 <br />53 <br />44 <br />62 <br />NBT <br />390 <br />305 <br />381 <br />266 <br />305 <br />SBL <br />80 <br />0 <br />1 <br />32 <br />64 <br />EBL <br />70 <br />8 <br />19 <br />11 <br />27 <br />EBR <br />150 <br />0 <br />0 <br />8 <br />64 <br />WBL <br />100 <br />0 <br />1 <br />75 <br />58 <br />WBR <br />100 <br />1 0 <br />1 <br />1 57 <br />43 <br />Main Street/Edgewood Road-1-5 Ramps <br />NBT <br />690 <br />101 <br />366 <br />70 <br />382 <br />SBL <br />150 <br />99 <br />161 <br />100 <br />164 <br />WBTL <br />250 <br />183 <br />114 <br />183 <br />113 <br />WBR <br />60 <br />50 <br />23 <br />50 <br />22 <br />Main Street/Santa Clara Avenue-1-5 NB On -Ramp <br />NBT <br />350 <br />132 <br />151 <br />157 <br />230 <br />Source: Translutions, 2019. Attachment B. <br />Bold = Exceeds storage length <br />'Queues reported are 95th Percentile queue lengths per movement in feet. <br />EBL =eastbound left; EBTL=eastbound through -left turn; NBL = northbound left; NWR = northwest bound night; SBL = southbound left; SBT= southbound turn; <br />SBT2 = southbound second turn; SER = southeast bound night turn; WBTL = westbound though -left turn <br />Freeway Segments: As shown in Table T-12, both with and without the Modified Project in Year 2040 condition, all <br />traffic study area freeway facilities would operate at unsatisfactory levels of service E or F except for the 1-5 <br />southbound Broadway and Main Street off -ramps in both the a.m. and p.m. peak hours. This is the same condition <br />that would occur with implementation of the Original Project, as shown on DER Table 4.11-28. Thus, like the Original <br />Project, the Modified Project would also result in less than significant impacts to freeway segments per Caltrans <br />criteria. <br />