Laserfiche WebLink
HCM 6th TWSC <br />8: Main St & Project Driveway 1 09/03/2019 <br />Intersection <br />Int Delay, s/veh 0 <br />Movement WBL WBR NBT NBR SBL SBT <br />Lane Configurations <br />Traffic Vol, vehrh 0 <br />Future Vol, veh/h 0 <br />Conflicting Peds, #/hr 0 <br />Sign Control Stop <br />RT Channelized <br />Storage Length <br />Veh in Median Storage, # <br />Grade, % <br />Peak Hour Factor <br />Heavy Vehicles, % <br />Mvmt Flow <br />1 <br />1502 <br />13 <br />0 <br />1 <br />1502 <br />13 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Stop <br />Free <br />Free <br />Free <br />None <br />None <br />0 <br />0 0 <br />0 0 <br />95 95 95 <br />2 2 2 <br />0 1 1581 <br />95 95 <br />2 2 <br />14 0 <br />1729 <br />1729 <br />0 <br />Free <br />None <br />0 <br />0 <br />95 <br />2 <br />1820 <br />Major/Minor Minorl <br />Majorl <br />Major2 <br />Conflicting Flow All - <br />798 0 <br />0 <br />Stage 1 - <br />Stage 2 - <br />- - <br />Critical Hdwy - <br />7.14 - <br />II <br />Critical Hdwy Stg 1 - <br />- - <br />Critical Hdwy Stg 2 - <br />- - <br />Follow-up Hdwy - <br />3.92 - <br />Pot Cap-1 Maneuver 0 <br />282 - <br />- 0 <br />Stage 1 0 <br />- - <br />- 0 <br />Stage 2 0 <br />- - <br />- 0 <br />Platoon blocked, % <br />- <br />- <br />Mov Cap-1 Maneuver - <br />282 - <br />- - <br />Mov Cap-2 Maneuver - <br />- - <br />- - <br />Stage 1 <br />x., <br />Stage 2 - <br />Approach WB NB SB <br />HCM Control Delay, s 17.8 0 0 <br />HCM LOS C <br />Minor Lane/Major Mvmt <br />NBT NBRWBLnl SBT <br />Capacity (veh/h) <br />- - 282 - <br />HCM Lane V/C Ratio <br />- - 0.004 - <br />HCM Control Delay (s) <br />- - 17.8 - <br />HCM Lane LOS <br />- - C - <br />HCM 95th °/dile Q(veh) <br />- - 0 - <br />The Addington 09/03/2019 Year 2040 Conditions - AM Peak hour Synchro 10 Report <br />Page 5 <br />