My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH - 2525 N MAIN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
11/19/2019
>
75D - PH - 2525 N MAIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 7:54:38 PM
Creation date
11/14/2019 5:55:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
11/19/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2525 North Main Street <br />October 28, 2019 <br />Page 3 <br />The North Santa Ana Preservation Alliance continued to voice opposition to the project and stated <br />that they would support three development options: rehabilitation and reuse of the existing office <br />building, redevelopment of the site with a new office building built in compliance with the <br />Professional zoning standards, or a residential project at a maximum density of 15 dwelling units <br />per acre (89 dwelling units). The first two options would be feasible under the existing zoning and <br />general plan. The third option would require a zone change to Two -Family Residential (R2) and a <br />general plan amendment to Medium Density Residential (MR-15) General Plan land use <br />designation. The applicant has indicated that the three development options proposed would make <br />the residential development project infeasible. <br />At its regular meeting on August 12, 2019, and after receiving public testimony on the item, the <br />Planning Commission vote resulted in an impasse on the proposed 347-unit residential <br />development. Based on the Planning Commission's bylaws, the applicant chose to appeal the <br />project to the City Council. The project was in process to be scheduled for a City Council public <br />hearing; however, in September the applicant advised staff that they would be making further <br />modifications to the project to address the comments received at the August 12t" Planning <br />Commission meeting. <br />Modified Proiect <br />On September 5, 2019, a meeting with the applicant and neighborhood was held to discuss <br />another series of modifications to the project that could include a reduction the number of units <br />proposed, reduction in project density and intensity, an increase in the parking ratio, and an <br />additional increase in the building setbacks. The applicant expressed that their goals in making <br />these modifications are to: address community input and concerns, create an opportunity for <br />additional parking for the Discovery Cube and the proposed development, to maintain as much of <br />the existing development pattern and existing parking lot as feasible, and to minimize changes to <br />the neighborhood at the project's edge. The modifications to the project to date represent a <br />significant reduction from previous submissions. However, the modified project remains <br />inconsistent with the development options that the North Santa Ana Preservation Alliance <br />expressed they would support. <br />In early October, the applicant formally submitted a modified project that consists of the following <br />elements: <br />• A reduction in the number of units to 256 units (formerly 347 units) <br />• A reduction in the project density to 58 dwelling units per acre (formerly 59 du/ac) <br />• An increase in the building setback on the east to 90 feet (formerly 66 feet) <br />• An increase in the building setback on the south to 134 feet (formerly 15 feet) <br />• The addition of residential surface level parking (104 spaces) along the east property line <br />• The addition of a surface level parking lot with shared parking with the Discover Cube along <br />the south property line (180 spaces) <br />• An increase in parking to 2.0 parking spaces per unit and 2.7 spaces per unit when utilizing <br />the shared parking lot (formerly 1.85 parking spaces per unit with 2.0 valet) <br />• A reduction in the amount of common open space (exterior and interior) <br />• Revised development agreement terms <br />
The URL can be used to link to this page
Your browser does not support the video tag.