Laserfiche WebLink
2525 North Main Street <br />October 28, 2019 <br />Page 8 <br />This project is required to comply with the City's Housing Opportunity Ordinance (HOO). To satisfy <br />the provisions of the HOO, applicant is proposing to pay an in -lieu fee in excess of $3,000,000. <br />See Table 4 below for a preliminary breakdown of the proposed HOO fee. <br />Table 4: Housing Opportunity Fee Summary <br />HA bi " )il $ uare ,Fo fa e; <br />I,nclusiona _Holism ",Fee <br />Es imated,Fee, ", <br />, Previou's,` P,ro'pct` <br />205,865 <br />$15 per square foot <br />$3,087,975 <br />$4,236,900 282,460 SF <br />*As measured from the exterior walls of the residential units. This calculation does not include exterior hallways, <br />common areas, landscape, open space or exterior stairways* <br />Analysis <br />Environmental Impact Report <br />The applicant submitted a development proposal that requires the approval of several discretionary <br />applications. Given the size and location of the project, as well as the proposed zoning and general <br />plan modifications, extensive environmental review was needed. After completion of the Initial Study <br />for the project, it was determined that the California Environmental Quality Act (CEQA) required the <br />preparation and certification of an environmental impact report (EIR) for this project. The purpose of <br />an EIR is to identify the significant effects on the environment of a project, to identify alternatives to <br />the project, and to indicate the manner in which those significant effects can be mitigated or avoided. <br />To determine what potential effects would be caused by the project, the EIR analyzed issues related <br />to Aesthetics; Air Quality; Biological Resources; Cultural/Historic Resources; Greenhouse Gas <br />Emissions; Hazards and Hazardous Materials; Land Use and Planning; Noise; Population and <br />Housing; Public Services; Transportation and Circulation; Tribal Cultural Resources; Utilities and <br />Service Systems; and Energy. <br />Previously, on February 12, 2018, the Initial Study and Notice of Preparation were released to solicit <br />comments regarding the scope and content of the Draft EIR (DEIR). A scoping meeting was held <br />on March 1, 2018 with approximately 164 people in attendance and a total of 163 written comment <br />letters received at the conclusion of the 30-day public comment period. The comments were <br />reviewed and additional areas of analysis and studies were added to the scope of the Draft EIR as <br />appropriate. The comments are included as Appendix A of the Draft EIR. <br />The Draft EIR analyzed the direct and indirect impacts resulting from construction and operation of <br />the originally proposed project. In addition to analyzing fourteen environmental topic areas, the EIR <br />also evaluated three options for access and egress to the project. The analysis included Main Street <br />access only as proposed (Option A), access from Main Street plus a secondary access/egress <br />driveway at the Main Street and Walkie Way/Santiago Park intersection (Option B), and <br />access/egress from both Main Street and Edgewood Road (Option C). <br />Three project alternatives were also analyzed within the document. These included a no build <br />alternative, where the existing approximately 80,000 square foot building would remain as is and <br />be reoccupied by an office use (Alternative 1); a reduced multi -family project consisting of a 30 <br />percent reduction in density (Alternative 2); and build out of the site under the existing Professional <br />